Splendora ISD | New Junior High School

14395 Canopies Parkway, Splendora, TX, 77372

Construction complete · Jun 2026Project Closed

Splendora ISD | New Junior High School is a new construction project at 14395 Canopies Parkway, Splendora, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $65.0M across about 147,199 sq ft.

Estimated project value
$65.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
147,199 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$442/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 21, 2023923 days across supplied datesJun 1, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    559 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    354 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Splendora ISD | New Junior High School

Splendora ISD | New Junior High School is a 147,199 sq ft new construction project located at 14395 Canopies Parkway in Splendora, Texas. The estimated cost for this facility is $65,000,000, which calculates to $442 per square foot. Construction began in December 2023 following a TDLR registration in November 2023. The project was designed by Huckabee and funded by public sources.

This development is part of a broader expansion by Splendora ISD, which also registered for the New Peach Creek Elementary School and New Greenleaf Elementary School. The project's scale is significant compared to local averages, with a cost above the county median of $800,000 for new construction filings.

Construction Scope and Timeline

The scheduled build window for this school was 559 days, which is longer than the county median of 213 days. The cost per square foot of $442 is also above the county median of $100. The final inspection was passed in June 2025. TDLR closed the project file in June 2026, which marks the end of the accessibility review process for this construction.

Huckabee, the design firm of record, has other projects in Texas, including the Midway ISD Midway HS Athletics Addition and Renovation in Waco. The completion of this junior high adds to the district's infrastructure in the region. The area profile for ZIP 77372 indicates a population of about 14,088 and a median household income of $78,601. The Montgomery County unemployment rate was 4.8 percent in July 2026.

The project file closure confirms the completion of the regulatory review process. The school is now part of the local educational landscape in Splendora. The use of public funds and the significant size of the project reflect a major investment in local education. The design and construction adhered to the standards required by TDLR before the file was closed.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77372 (Splendora)

One email per change. Unsubscribe in one click. Privacy.

Splendora ISD | New Junior High School is a New Construction project located at 14395 Canopies Parkway, Splendora, TX 77372 in Splendora, Texas. The project has an estimated value of $65.0M covering 147,199 sq ft. Splendora ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on November 21, 2023.

Frequently Asked Questions

Is the Splendora ISD junior high school open?

The TDLR record shows the final inspection was passed in June 2025 and the project file was closed in June 2026. This confirms the construction and review process are complete.

Who designed the new junior high school?

The design firm of record is Huckabee, which has other TDLR-registered projects in Texas, including renovations in Waco and Killeen.

What is the estimated cost of the project?

The estimated cost is $65,000,000. This figure is above the Montgomery County median of $800,000 for new construction filings.

When was the project registered with TDLR?

The project was registered with TDLR in November 2023. Construction started in December 2023, and the file was closed in June 2026.

What is Splendora ISD | New Junior High School?

Splendora ISD | New Junior High School is a new construction project at 14395 Canopies Parkway in Splendora, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Junior High School for Splendora ISD.

Is Splendora ISD | New Junior High School open in Splendora?

Construction on Splendora ISD | New Junior High School is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Splendora ISD | New Junior High School located?

Splendora ISD | New Junior High School is located at 14395 Canopies Parkway, Splendora, TX, 77372, in Montgomery County.

Who is the owner or developer of Splendora ISD | New Junior High School?

Splendora ISD is the property owner/developer of record for Splendora ISD | New Junior High School, per its TDLR project registration.

Who is the architect or design firm for Splendora ISD | New Junior High School?

Huckabee is the design firm of record for Splendora ISD | New Junior High School, according to its TDLR filing.

How much does Splendora ISD | New Junior High School cost and how big is it?

Splendora ISD | New Junior High School has an estimated construction value of $65.0M and approximately 147,199 square feet (about $442/sqft), based on its TDLR filing.

Scope of Work

New Junior High School for Splendora ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

14395 Canopies Parkway, Splendora, TX, 77372

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77372 (Splendora)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Splendora?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.