Beazer
Beazer is a renovation/alteration project at 13430 NW Freeway, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $1.2M across about 19,542 sq ft.
๐Project Metrics
TDLR #TABS2024006436Project Closed
Project has been completed and closed
Beazer is a Renovation/Alteration project located at 13430 NW Freeway, Houston, TX 77040 in Houston, Texas. The project has an estimated value of $1.2M covering 19,542 sq ft. World Houston Place JV is the property owner and Lamoureux Design Studio is the design firm of record. The project was registered with TDLR on December 1, 2023.
โFrequently Asked Questions
What is Beazer?
Beazer is a renovation/alteration project at 13430 NW Freeway in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: office remodel
Is Beazer open in Houston?
Construction on Beazer is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Beazer located?
Beazer is located at 13430 NW Freeway, Houston, TX, 77040, in Harris County.
Who is the owner or developer of Beazer?
World Houston Place JV is the property owner/developer of record for Beazer, per its TDLR project registration.
Who is the architect or design firm for Beazer?
Lamoureux Design Studio is the design firm of record for Beazer, according to its TDLR filing.
How much does Beazer cost and how big is it?
Beazer has an estimated construction value of $1.2M and approximately 19,542 square feet (about $62/sqft), based on its TDLR filing.
๐Scope of Work
office remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 1, 2023
Review Complete
Inspection Complete
Closed
Apr 30, 2024