Nike NTS
Nike NTS is a renovation/alteration project at 4615 N LAMAR BLVD #305, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $275K across about 3,044 sq ft.
๐Project Metrics
TDLR #TABS2024006560Project Closed
Project has been completed and closed
Nike NTS is a Renovation/Alteration project located at 4615 N LAMAR BLVD #305, Austin, TX 78751 in Austin, Texas. The project has an estimated value of $275K covering 3,044 sq ft. AP TRIANGLE RETAIL, LLC is the property owner and Design Parameters LLC is the design firm of record. The project was registered with TDLR on December 4, 2023.
โFrequently Asked Questions
What is Nike NTS?
Nike NTS is a renovation/alteration project at 4615 N LAMAR BLVD #305 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish for a Fitness Studio in a prior Shoe Store Retail strip mall
Is Nike NTS open in Austin?
Construction on Nike NTS is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is Nike NTS located?
Nike NTS is located at 4615 N LAMAR BLVD #305, Austin, TX, 78751, in Travis County.
Who is the owner or developer of Nike NTS?
AP TRIANGLE RETAIL, LLC is the property owner/developer of record for Nike NTS, per its TDLR project registration.
Who is the architect or design firm for Nike NTS?
Design Parameters LLC is the design firm of record for Nike NTS, according to its TDLR filing.
How much does Nike NTS cost and how big is it?
Nike NTS has an estimated construction value of $275K and approximately 3,044 square feet (about $90/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Finish for a Fitness Studio in a prior Shoe Store Retail strip mall
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 4, 2023
Review Complete
Inspection Complete
Closed
Mar 15, 2024
๐Related Projects
๐๏ธSame Design Firm
$22.9M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration
Excavate and replace main sewer line
4615 Lyons Rd #1 140ft of poly gas line being ran to a fire pit. This is a dedicated gas line.
Electrical mass is bent broke the meter hub panel and meter are falling off the residence at 4615 Gillis st . looking to schedule an emergency repair
New construction accessory use to primary 1-story pool house with full bath.