Uplands I EPE TI
Uplands I EPE TI is a renovation/alteration project at 5301 Southwest Parkway Suite 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $850K across about 14,588 sq ft.
๐Project Metrics
TDLR #TABS2024006774Project Closed
Project has been completed and closed
Uplands I EPE TI is a Renovation/Alteration project located at 5301 Southwest Parkway Suite 150, Austin, TX 78735 in Austin, Texas. The project has an estimated value of $850K covering 14,588 sq ft. Drawbridge Realty is the property owner and Levy Dykema Architects is the design firm of record. The project was registered with TDLR on December 6, 2023.
โFrequently Asked Questions
What is Uplands I EPE TI?
Uplands I EPE TI is a renovation/alteration project at 5301 Southwest Parkway Suite 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing commerical offices spaces for a new tenant.
Is Uplands I EPE TI open in Austin?
Construction on Uplands I EPE TI is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is Uplands I EPE TI located?
Uplands I EPE TI is located at 5301 Southwest Parkway Suite 150, Austin, TX, 78735, in Travis County.
Who is the owner or developer of Uplands I EPE TI?
Drawbridge Realty is the property owner/developer of record for Uplands I EPE TI, per its TDLR project registration.
Who is the architect or design firm for Uplands I EPE TI?
Levy Dykema Architects is the design firm of record for Uplands I EPE TI, according to its TDLR filing.
How much does Uplands I EPE TI cost and how big is it?
Uplands I EPE TI has an estimated construction value of $850K and approximately 14,588 square feet (about $58/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing commerical offices spaces for a new tenant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 6, 2023
Review Complete
Inspection Complete
Closed
Jun 3, 2024
๐Related Projects
๐คSame Owner
$17.9M total๐Related City Permits
Building permits found at or near this location
Renovation of one floor of a 4 story office building includes consolidation of the current leased area from approximately 43200 sf full floor use to a partial floor area of approximately 20000 sf. New construction includes demising walls a new mail room two new meeting rooms and furniture and equipment.
TEMP POWER etj
Total removal of all hazardous electrical service and riser. Installation of new Austin energy approved meter can new 200-amp main breaker eaton CH load center install installation of new CH lifetime warranty circuit breakers installation of 28-foot ground rods insulation of new water bond installation of gas bond insulation of new whole home surge protection.
ETJ-New SFR (AE) permanent service 2354 square feet
Renovation of one floor of a 4 story office building includes consolidation of the current leased area from approximately 43200 sf full floor use to a partial floor area of approximately 20000 sf. New construction includes demising walls a new mail room two new meeting rooms and furniture and equipment.