DWMR
DWMR is a renovation/alteration project at 600 Congress, suite 2700, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $3.3M across about 13,173 sq ft.
๐Project Metrics
TDLR #TABS2024007544Project Closed
Project has been completed and closed
DWMR is a Renovation/Alteration project located at 600 Congress, suite 2700, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $3.3M covering 13,173 sq ft. Beacon Capital Partners is the property owner and Perkins&Will is the design firm of record. The project was registered with TDLR on December 15, 2023.
โFrequently Asked Questions
What is DWMR?
DWMR is a renovation/alteration project at 600 Congress, suite 2700 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Full floor alteration/renovation of interior office lease space on level 27
Is DWMR open in Austin?
Construction on DWMR is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is DWMR located?
DWMR is located at 600 Congress, suite 2700, Austin, TX, 78701, in Travis County.
Who is the owner or developer of DWMR?
Beacon Capital Partners is the property owner/developer of record for DWMR, per its TDLR project registration.
Who is the architect or design firm for DWMR?
Perkins&Will is the design firm of record for DWMR, according to its TDLR filing.
How much does DWMR cost and how big is it?
DWMR has an estimated construction value of $3.3M and approximately 13,173 square feet (about $249/sqft), based on its TDLR filing.
๐Scope of Work
Full floor alteration/renovation of interior office lease space on level 27
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 15, 2023
Review Complete
Inspection Complete
Closed
May 24, 2024
๐Related Projects
๐คSame Owner
$141.6M total๐๏ธSame Design Firm
$8.48B total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
(Phillips Clint) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
14.11 kw DC solar installation on a new construction residential roof with a 20 kwh battery backup.
New pool
ePlan: Residential Expedited Review - New Autofill Pool