Project intelligenceTDLR TABS2024007591Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Valvoline Instant Oil Change

9706 Bilbrook PL, Austin, TX, 78748

Construction complete · Jan 2026Project Closed

Valvoline Instant Oil Change is a renovation/alteration project at 9706 Bilbrook PL, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $75K across about 1,000 sq ft.

Estimated project value
$75K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$75/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 18, 2023748 days across supplied datesJan 4, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    175 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    161 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    412 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78748 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Valvoline Instant Oil Change is a Renovation/Alteration project located at 9706 Bilbrook PL, Austin, TX 78748 in Austin, Texas. The project has an estimated value of $75K covering 1,000 sq ft. Valvoline LLC is the property owner and Greenbergfarrow is the design firm of record. The project was registered with TDLR on December 18, 2023.

Frequently Asked Questions

What is Valvoline Instant Oil Change?

Valvoline Instant Oil Change is a renovation/alteration project at 9706 Bilbrook PL in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Improvements include exterior parking lot and drive lane expansion, stormwater detention pond expansion, and parking lot restriping.

Is Valvoline Instant Oil Change open in Austin?

Construction on Valvoline Instant Oil Change is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.

Where is Valvoline Instant Oil Change located?

Valvoline Instant Oil Change is located at 9706 Bilbrook PL, Austin, TX, 78748, in Travis County.

Who is the owner or developer of Valvoline Instant Oil Change?

Valvoline LLC is the property owner/developer of record for Valvoline Instant Oil Change, per its TDLR project registration.

Who is the architect or design firm for Valvoline Instant Oil Change?

Greenbergfarrow is the design firm of record for Valvoline Instant Oil Change, according to its TDLR filing.

How much does Valvoline Instant Oil Change cost and how big is it?

Valvoline Instant Oil Change has an estimated construction value of $75K and approximately 1,000 square feet (about $75/sqft), based on its TDLR filing.

Scope of Work

Improvements include exterior parking lot and drive lane expansion, stormwater detention pond expansion, and parking lot restriping.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9706 Bilbrook PL, Austin, TX, 78748

Location by street address

Related City Permits

Building permits found at or near this location

9706 FM 969 RD

[ETJ] Burn Damaged Meter can Base and old Panel to be Removed for repairs and upgrades. Will replaced with a new Meter loop service on the existing pole. Its a 320 Amp single phase service with one 200 amp & one 150amp panels. Reconnect emergency connection

ActiveElectrical PermitUpgradeJul 2026
View Details
2026-088487 EP
Copperhead Electrical Services LLC
9706 CHUKAR CIR

sewer yard line repair roughly 30ft

FinalPlumbing PermitRepairJun 2026
View Details
2026-071723 PP
Stan's Heating, Air, & Plumbing
9706 WILLERS WAY

Replacement of an existing water heater water heater change out 9706 Willers Way Austin TX 78748

FinalPlumbing PermitChange OutJun 2026
View Details
2026-067430 PP
Radiant Plumbing & AC
9706 KENDAL DR

Excavate 30 tunnel to repair main drain line under house

ExpiredPlumbing PermitRepairDec 2025
View Details
2025-161862 PP
Radiant Plumbing & AC
9706 HANSFORD DR

Proposal is to correct sewer line underneath the home. This will require us to tunnel under the home about 10. We will be accessing the drain system for the laundry and kitchen sink. The camera inspection found holding water and a break on the drain system. The camera didnt appear to go past the fitting after the kitchen sink. We will be replacing this section of cast iron with PVC piping. Once the system is corrected. We will run a hydrostatic test to ensure the system is functioning properly. Once we have completed the test. We will have an inspector come out to view the system. Once a passing inspection is acquired. We will then backfill the tunnel per engineer guidelines. This will complete the job

FinalPlumbing PermitRepairDec 2025
View Details
2025-156577 PP
Vaquero Plumbing

Watch all construction in 78748 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.