Project intelligenceTDLR TABS2024007839Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bonham Middle School Add & Reno in Temple, TX

4600 Midway Dr, Temple, TX, 76502

Construction complete · May 2026Project Closed

Bonham Middle School Add & Reno is a renovation/alteration project at 4600 Midway Dr, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $16.0M across about 36,203 sq ft.

Estimated project value
$16.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
36,203 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$442/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 20, 2023881 days across supplied datesMay 19, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    72 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    532 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    174 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    103 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76502 (Temple)

One email per change. Unsubscribe in one click. Privacy.

Bonham Middle School Add & Reno is a Renovation/Alteration project located at 4600 Midway Dr, Temple, TX 76502 in Temple, Texas. The project has an estimated value of $16.0M covering 36,203 sq ft. Temple ISD - Kent Boyd is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on December 20, 2023.

Frequently Asked Questions

What is Bonham Middle School Add & Reno?

Bonham Middle School Add & Reno is a renovation/alteration project at 4600 Midway Dr in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of new dining room, kitchen, library, and support spaces to an existing 100,000 sf middle school. Renovated locker rooms, offices, and classrooms within existing building. Reconfigured driveway and parking near new addition.

Is Bonham Middle School Add & Reno open in Temple?

Construction on Bonham Middle School Add & Reno is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is Bonham Middle School Add & Reno located?

Bonham Middle School Add & Reno is located at 4600 Midway Dr, Temple, TX, 76502, in Bell County.

Who is the owner or developer of Bonham Middle School Add & Reno?

Temple ISD - Kent Boyd is the property owner/developer of record for Bonham Middle School Add & Reno, per its TDLR project registration.

Who is the architect or design firm for Bonham Middle School Add & Reno?

Stantec Architecture Inc. is the design firm of record for Bonham Middle School Add & Reno, according to its TDLR filing.

How much does Bonham Middle School Add & Reno cost and how big is it?

Bonham Middle School Add & Reno has an estimated construction value of $16.0M and approximately 36,203 square feet (about $442/sqft), based on its TDLR filing.

Scope of Work

Addition of new dining room, kitchen, library, and support spaces to an existing 100,000 sf middle school. Renovated locker rooms, offices, and classrooms within existing building. Reconfigured driveway and parking near new addition.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4600 Midway Dr, Temple, TX, 76502

Location by street address

Watch all construction in 76502 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.