CK Tollway 130 & FM 969
CK Tollway 130 & FM 969 is a renovation/alteration project at 12200 FM 969, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.1M across about 1,680 sq ft.
๐Project Metrics
TDLR #TABS2024008561Project Registered
Project has been registered with TDLR and is in pre-construction phase
CK Tollway 130 & FM 969 is a Renovation/Alteration project located at 12200 FM 969, Austin, TX 72724 in Austin, Texas. The project has an estimated value of $2.1M covering 1,680 sq ft. Circle K Stores, Inc. is the property owner and Castles Design Group is the design firm of record. The project was registered with TDLR on January 4, 2024.
โFrequently Asked Questions
What is CK Tollway 130 & FM 969?
CK Tollway 130 & FM 969 is a renovation/alteration project at 12200 FM 969 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Parking lot addition, with a 1,680 sq.ft. diesel canopy housing 4 diesel fuel pumps.
Is CK Tollway 130 & FM 969 open in Austin?
CK Tollway 130 & FM 969 is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Where is CK Tollway 130 & FM 969 located?
CK Tollway 130 & FM 969 is located at 12200 FM 969, Austin, TX, 72724, in Travis County.
Who is the owner or developer of CK Tollway 130 & FM 969?
Circle K Stores, Inc. is the property owner/developer of record for CK Tollway 130 & FM 969, per its TDLR project registration.
Who is the architect or design firm for CK Tollway 130 & FM 969?
Castles Design Group is the design firm of record for CK Tollway 130 & FM 969, according to its TDLR filing.
How much does CK Tollway 130 & FM 969 cost and how big is it?
CK Tollway 130 & FM 969 has an estimated construction value of $2.1M and approximately 1,680 square feet (about $1.24K/sqft), based on its TDLR filing.
๐Scope of Work
Parking lot addition, with a 1,680 sq.ft. diesel canopy housing 4 diesel fuel pumps.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 4, 2024
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$148.4M total๐Related City Permits
Building permits found at or near this location
Replacement of building heating boilers only disconnect/reconnect gas line to replace
Express: Foundation repair
Pool - Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad.
Pool - Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad.
Pool - Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad.