FUSE EMLK
FUSE EMLK is a renovation/alteration project at 2105 E MLK, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $1.9M across about 31,525 sq ft.
๐Project Metrics
TDLR #TABS2024009221Project Closed
Project has been completed and closed
FUSE EMLK is a Renovation/Alteration project located at 2105 E MLK, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $1.9M covering 31,525 sq ft. 2115 E MLK LLC is the property owner and L M Holder III FAIA is the design firm of record. The project was registered with TDLR on January 14, 2024.
โFrequently Asked Questions
What is FUSE EMLK?
FUSE EMLK is a renovation/alteration project at 2105 E MLK in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish-out of all three floors of shell building for Co-Working offices, meeting rooms, and members' cafe.
Is FUSE EMLK open in Austin?
Construction on FUSE EMLK is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is FUSE EMLK located?
FUSE EMLK is located at 2105 E MLK, Austin, TX, 78702, in Travis County.
Who is the owner or developer of FUSE EMLK?
2115 E MLK LLC is the property owner/developer of record for FUSE EMLK, per its TDLR project registration.
Who is the architect or design firm for FUSE EMLK?
L M Holder III FAIA is the design firm of record for FUSE EMLK, according to its TDLR filing.
How much does FUSE EMLK cost and how big is it?
FUSE EMLK has an estimated construction value of $1.9M and approximately 31,525 square feet (about $60/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish-out of all three floors of shell building for Co-Working offices, meeting rooms, and members' cafe.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 14, 2024
Review Complete
Inspection Complete
Closed
Dec 31, 2024
๐Related Projects
๐Related City Permits
Building permits found at or near this location
*Partial Demo* Addition/interior remodel to single-story SFR
QT PV - Rooftop Solar. Line side tap interconnection for Existing Multi-Family Building-HP3 Requesting Auxiliary Power EP and Electrical Permit
QT PV - Rooftop Solar. Line side tap interconnection for Existing Multi-Family Building-HP3 Requesting Auxiliary Power EP and Electrical Permit
QT PV - Rooftop Solar for Building HP3
QT PV - Rooftop Solar for Building HP3