Callejo Road Improvements
Callejo Road Improvements is a renovation/alteration project at Callejo Road, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $9.4M across about 25,000 sq ft.
๐Project Metrics
TDLR #TABS2024009384Review Complete
Design review complete, construction may proceed
Callejo Road Improvements is a Renovation/Alteration project located at Callejo Road, Garland, TX 75044 in Garland, Texas. The project has an estimated value of $9.4M covering 25,000 sq ft. City of Garland is the property owner and CP&Y is the design firm of record. The project was registered with TDLR on January 17, 2024.
โFrequently Asked Questions
What is Callejo Road Improvements?
Callejo Road Improvements is a renovation/alteration project at Callejo Road in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of Callejo Road from Big Springs to Botello (Approx 1 Mile). Reconstruction of road to a concrete curb and gutter section (currently asphalt with bar ditches). New storm drain system, New sidewalks, Wastewater Replacements.
Is Callejo Road Improvements open in Garland?
Callejo Road Improvements is currently under construction in Garland, TX. Its current TDLR status is "Review Complete".
Where is Callejo Road Improvements located?
Callejo Road Improvements is located at Callejo Road, Garland, TX, 75044, in Dallas County.
Who is the owner or developer of Callejo Road Improvements?
City of Garland is the property owner/developer of record for Callejo Road Improvements, per its TDLR project registration.
Who is the architect or design firm for Callejo Road Improvements?
CP&Y is the design firm of record for Callejo Road Improvements, according to its TDLR filing.
How much does Callejo Road Improvements cost and how big is it?
Callejo Road Improvements has an estimated construction value of $9.4M and approximately 25,000 square feet (about $376/sqft), based on its TDLR filing.
๐Scope of Work
Reconstruction of Callejo Road from Big Springs to Botello (Approx 1 Mile). Reconstruction of road to a concrete curb and gutter section (currently asphalt with bar ditches). New storm drain system, New sidewalks, Wastewater Replacements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 17, 2024
Review Complete
Jan 17, 2024
Inspection Complete
Closed