Project intelligenceTDLR TABS2024011231Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

IH 35 (CSJ: 0194-01-010, etc.)

From: 0.2 MI South of US 82 To: Exit 1 in Oklahoma, Gainesville, TX, 76240

Opening ~Oct 2029Review Complete

IH 35 (CSJ: 0194-01-010, etc.) is a renovation/alteration project at From: 0.2 MI South of US 82 To: Exit 1 in Oklahoma, Gainesville, in Cooke County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2029. The project has an estimated value of $313.5M across about 104,408 sq ft.

Estimated project value
$313.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
104,408 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 9, 20242,061 days across supplied datesOct 1, 2029

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    174 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,887 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76240 (Gainesville)

One email per change. Unsubscribe in one click. Privacy.

IH 35 (CSJ: 0194-01-010, etc.) is a Renovation/Alteration project located at From: 0.2 MI South of US 82 To: Exit 1 in Oklahoma, Gainesville, TX 76240 in Gainesville, Texas. The project has an estimated value of $313.5M covering 104,408 sq ft. TxDOT District: Wichita Falls is the property owner and CP&Y is the design firm of record. The project was registered with TDLR on February 9, 2024.

Frequently Asked Questions

What is IH 35 (CSJ: 0194-01-010, etc.)?

IH 35 (CSJ: 0194-01-010, etc.) is a renovation/alteration project at From: 0.2 MI South of US 82 To: Exit 1 in Oklahoma in Gainesville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of an interstate facility, including main-lanes, frontage roads, ramps and cross streets.

Is IH 35 (CSJ: 0194-01-010, etc.) open in Gainesville?

IH 35 (CSJ: 0194-01-010, etc.) is still under construction in Gainesville, TX, with an estimated completion of Oct 2029 according to its TDLR registration.

Where is IH 35 (CSJ: 0194-01-010, etc.) located?

IH 35 (CSJ: 0194-01-010, etc.) is located at From: 0.2 MI South of US 82 To: Exit 1 in Oklahoma, Gainesville, TX, 76240, in Cooke County.

Who is the owner or developer of IH 35 (CSJ: 0194-01-010, etc.)?

TxDOT District: Wichita Falls is the property owner/developer of record for IH 35 (CSJ: 0194-01-010, etc.), per its TDLR project registration.

Who is the architect or design firm for IH 35 (CSJ: 0194-01-010, etc.)?

CP&Y is the design firm of record for IH 35 (CSJ: 0194-01-010, etc.), according to its TDLR filing.

How much does IH 35 (CSJ: 0194-01-010, etc.) cost and how big is it?

IH 35 (CSJ: 0194-01-010, etc.) has an estimated construction value of $313.5M and approximately 104,408 square feet (about $3.00K/sqft), based on its TDLR filing.

Scope of Work

Reconstruction of an interstate facility, including main-lanes, frontage roads, ramps and cross streets.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: 0.2 MI South of US 82 To: Exit 1 in Oklahoma, Gainesville, TX 76240

33.64075, -97.14512

Watch all construction in 76240 (Gainesville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Cooke

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists