Project intelligenceTDLR TABS2023008786New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Wellborn SUD 2020 Water Supply and Distribution Improvements

11831 Mumford Benchley Road, Bryan, TX, 77807

Target date passed (Mar 2025)Review Complete

Wellborn SUD 2020 Water Supply and Distribution Improvements is a new construction project at 11831 Mumford Benchley Road, Bryan, in Robertson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.0M across about 4,000 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$750/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 5, 2023815 days across supplied datesMar 30, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    86 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    729 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77807 (Bryan)

One email per change. Unsubscribe in one click. Privacy.

Wellborn SUD 2020 Water Supply and Distribution Improvements is a New Construction project located at 11831 Mumford Benchley Road, Bryan, TX 77807 in Bryan, Texas. The project has an estimated value of $3.0M covering 4,000 sq ft. Wellborn Special Utility District is the property owner and CP&Y is the design firm of record. The project was registered with TDLR on January 5, 2023.

Frequently Asked Questions

What is Wellborn SUD 2020 Water Supply and Distribution Improvements?

Wellborn SUD 2020 Water Supply and Distribution Improvements is a new construction project at 11831 Mumford Benchley Road in Bryan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New water well site, electrical building and chemical buildings

Is Wellborn SUD 2020 Water Supply and Distribution Improvements open in Bryan?

Wellborn SUD 2020 Water Supply and Distribution Improvements was scheduled to finish construction in Mar 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Wellborn SUD 2020 Water Supply and Distribution Improvements located?

Wellborn SUD 2020 Water Supply and Distribution Improvements is located at 11831 Mumford Benchley Road, Bryan, TX, 77807, in Robertson County.

Who is the owner or developer of Wellborn SUD 2020 Water Supply and Distribution Improvements?

Wellborn Special Utility District is the property owner/developer of record for Wellborn SUD 2020 Water Supply and Distribution Improvements, per its TDLR project registration.

Who is the architect or design firm for Wellborn SUD 2020 Water Supply and Distribution Improvements?

CP&Y is the design firm of record for Wellborn SUD 2020 Water Supply and Distribution Improvements, according to its TDLR filing.

How much does Wellborn SUD 2020 Water Supply and Distribution Improvements cost and how big is it?

Wellborn SUD 2020 Water Supply and Distribution Improvements has an estimated construction value of $3.0M and approximately 4,000 square feet (about $750/sqft), based on its TDLR filing.

Scope of Work

New water well site, electrical building and chemical buildings

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

11831 Mumford Benchley Road, Bryan, TX 77807

30.74354, -96.48075

Watch all construction in 77807 (Bryan)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Robertson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists