US 60 (CSJ:0168-07-043, ETC.)
From: Divided 4-Lane To: Tierra Blanca Crk Bridge, Hereford, TX, 79045
US 60 (CSJ:0168-07-043, ETC.) is a new construction project at From: Divided 4-Lane To: Tierra Blanca Crk Bridge, Hereford, in Deaf Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $24.8M across about 66,510 sq ft.
- Estimated project value
- $24.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 66,510 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $372/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
148 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
611 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79045 (Hereford)
One email per change. Unsubscribe in one click. Privacy.
US 60 (CSJ:0168-07-043, ETC.) is a New Construction project located at From: Divided 4-Lane To: Tierra Blanca Crk Bridge, Hereford, TX 79045 in Hereford, Texas. The project has an estimated value of $24.8M covering 66,510 sq ft. TxDOT District: Amarillo is the property owner and CP&Y is the design firm of record. The project was registered with TDLR on December 5, 2023.
Frequently Asked Questions
What is US 60 (CSJ:0168-07-043, ETC.)?
US 60 (CSJ:0168-07-043, ETC.) is a new construction project at From: Divided 4-Lane To: Tierra Blanca Crk Bridge in Hereford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitation of existing roadway to install drainage, concrete paving, sidewalks and ramps along US 60 through the town of Hereford, Texas.
Is US 60 (CSJ:0168-07-043, ETC.) open in Hereford?
US 60 (CSJ:0168-07-043, ETC.) was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is US 60 (CSJ:0168-07-043, ETC.) located?
US 60 (CSJ:0168-07-043, ETC.) is located at From: Divided 4-Lane To: Tierra Blanca Crk Bridge, Hereford, TX, 79045, in Deaf Smith County.
Who is the owner or developer of US 60 (CSJ:0168-07-043, ETC.)?
TxDOT District: Amarillo is the property owner/developer of record for US 60 (CSJ:0168-07-043, ETC.), per its TDLR project registration.
Who is the architect or design firm for US 60 (CSJ:0168-07-043, ETC.)?
CP&Y is the design firm of record for US 60 (CSJ:0168-07-043, ETC.), according to its TDLR filing.
How much does US 60 (CSJ:0168-07-043, ETC.) cost and how big is it?
US 60 (CSJ:0168-07-043, ETC.) has an estimated construction value of $24.8M and approximately 66,510 square feet (about $372/sqft), based on its TDLR filing.
Scope of Work
Rehabilitation of existing roadway to install drainage, concrete paving, sidewalks and ramps along US 60 through the town of Hereford, Texas.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: Divided 4-Lane To: Tierra Blanca Crk Bridge, Hereford, TX 79045
Related Projects
Same Owner
$37.03B totalWatch all construction in 79045 (Hereford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.