City of Pilot Point Fire Station #3
City of Pilot Point Fire Station #3 is a new construction project at 6321 FM 1385, Pilot Point, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $7.0M across about 14,571 sq ft.
๐Project Metrics
TDLR #TABS2024009592Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes โ permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76258 (Pilot Point)
One email per change. Unsubscribe in one click. Privacy.
City of Pilot Point Fire Station #3 is a New Construction project located at 6321 FM 1385, Pilot Point, TX 76258 in Pilot Point, Texas. The project has an estimated value of $7.0M covering 14,571 sq ft. City of Pilot Point, Texas is the property owner and Brandstetter Carroll, Inc. is the design firm of record. The project was registered with TDLR on January 18, 2024.
โFrequently Asked Questions
What is City of Pilot Point Fire Station #3?
City of Pilot Point Fire Station #3 is a new construction project at 6321 FM 1385 in Pilot Point, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of a new 14,571 GSF, single-story, Fire Station for the City of Pilot Point, TX. Construction will utilize a pre-engineered metal building frame with light gauge metal studs, metal roofing and faux stone veneer, andโฆ
Is City of Pilot Point Fire Station #3 open in Pilot Point?
City of Pilot Point Fire Station #3 is currently under construction in Pilot Point, TX. Its current TDLR status is "Review Complete".
Where is City of Pilot Point Fire Station #3 located?
City of Pilot Point Fire Station #3 is located at 6321 FM 1385, Pilot Point, TX, 76258, in Denton County.
Who is the owner or developer of City of Pilot Point Fire Station #3?
City of Pilot Point, Texas is the property owner/developer of record for City of Pilot Point Fire Station #3, per its TDLR project registration.
Who is the architect or design firm for City of Pilot Point Fire Station #3?
Brandstetter Carroll, Inc. is the design firm of record for City of Pilot Point Fire Station #3, according to its TDLR filing.
How much does City of Pilot Point Fire Station #3 cost and how big is it?
City of Pilot Point Fire Station #3 has an estimated construction value of $7.0M and approximately 14,571 square feet (about $480/sqft), based on its TDLR filing.
๐Scope of Work
The project consists of a new 14,571 GSF, single-story, Fire Station for the City of Pilot Point, TX. Construction will utilize a pre-engineered metal building frame with light gauge metal studs, metal roofing and faux stone veneer, and parking.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 18, 2024
Review Complete
Jan 18, 2024
Inspection Complete
Closed
๐Related Projects
Property Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Denton County
Find General Contractors in DentonWatch all construction in 76258 (Pilot Point)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.