Project intelligenceTDLR TABS2024009692New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Dekalb Downtown Sidewalk

132 N. Runnels Street, Dekalb, TX, 75559

Construction complete · Aug 2024Project Closed

Dekalb Downtown Sidewalk is a new construction project at 132 N. Runnels Street, Dekalb, in Bowie County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $300K across about 2,400 sq ft.

Estimated project value
$300K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$125/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 19, 2024210 days across supplied datesAug 16, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    87 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75559 (Dekalb)

One email per change. Unsubscribe in one click. Privacy.

Dekalb Downtown Sidewalk is a New Construction project located at 132 N. Runnels Street, Dekalb, TX 75559 in Dekalb, Texas. The project has an estimated value of $300K covering 2,400 sq ft. City of Dekalb is the property owner. The project was registered with TDLR on January 19, 2024.

Frequently Asked Questions

What is Dekalb Downtown Sidewalk?

Dekalb Downtown Sidewalk is a new construction project at 132 N. Runnels Street in Dekalb, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace approximately 800 square yards of concrete sidewalk, install handrails and ADA ramps

Is Dekalb Downtown Sidewalk open in Dekalb?

Construction on Dekalb Downtown Sidewalk is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.

Where is Dekalb Downtown Sidewalk located?

Dekalb Downtown Sidewalk is located at 132 N. Runnels Street, Dekalb, TX, 75559, in Bowie County.

Who is the owner or developer of Dekalb Downtown Sidewalk?

City of Dekalb is the property owner/developer of record for Dekalb Downtown Sidewalk, per its TDLR project registration.

How much does Dekalb Downtown Sidewalk cost and how big is it?

Dekalb Downtown Sidewalk has an estimated construction value of $300K and approximately 2,400 square feet (about $125/sqft), based on its TDLR filing.

Scope of Work

Remove and replace approximately 800 square yards of concrete sidewalk, install handrails and ADA ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

132 N. Runnels Street, Dekalb, TX, 75559

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75559 (Dekalb)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.