Valley Chile Road Reconstruction
Valley Chile Road Reconstruction is a renovation/alteration project at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $7.0M across about 255,000 sq ft.
๐Project Metrics
TDLR #TABS2024009769Review Complete
Design review complete, construction may proceed
Valley Chile Road Reconstruction is a Renovation/Alteration project located at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, TX 79821 in Vinton, Texas. The project has an estimated value of $7.0M covering 255,000 sq ft. Village of Vinton is the property owner and Huitt-Zollars is the design firm of record. The project was registered with TDLR on January 22, 2024.
โFrequently Asked Questions
What is Valley Chile Road Reconstruction?
Valley Chile Road Reconstruction is a renovation/alteration project at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210 in Vinton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Operational improvements to Valley Chile Rd from Doniphan Dr to I-H 10 Frontage Rd. The project will include concrete pavement, drainage improvements, dual left turn lane, sidewalk, ADA ramps, signage & pavemt mrk and safety lighting.
Is Valley Chile Road Reconstruction open in Vinton?
Valley Chile Road Reconstruction is still under construction in Vinton, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is Valley Chile Road Reconstruction located?
Valley Chile Road Reconstruction is located at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, TX, 79821, in El Paso County.
Who is the owner or developer of Valley Chile Road Reconstruction?
Village of Vinton is the property owner/developer of record for Valley Chile Road Reconstruction, per its TDLR project registration.
Who is the architect or design firm for Valley Chile Road Reconstruction?
Huitt-Zollars is the design firm of record for Valley Chile Road Reconstruction, according to its TDLR filing.
How much does Valley Chile Road Reconstruction cost and how big is it?
Valley Chile Road Reconstruction has an estimated construction value of $7.0M and approximately 255,000 square feet (about $27/sqft), based on its TDLR filing.
๐Scope of Work
Operational improvements to Valley Chile Rd from Doniphan Dr to I-H 10 Frontage Rd. The project will include concrete pavement, drainage improvements, dual left turn lane, sidewalk, ADA ramps, signage & pavemt mrk and safety lighting.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 22, 2024
Review Complete
Jan 22, 2024
Inspection Complete
Closed