Valley Chile Road Reconstruction in Vinton, TX
100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, TX, 79821
Valley Chile Road Reconstruction is a renovation/alteration project at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $7.0M across about 255,000 sq ft.
- Estimated project value
- $7.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 255,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $27/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 years
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
644 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
732 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79821 (Vinton)
One email per change. Unsubscribe in one click. Privacy.
Valley Chile Road Reconstruction is a Renovation/Alteration project located at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, TX 79821 in Vinton, Texas. The project has an estimated value of $7.0M covering 255,000 sq ft. Village of Vinton is the property owner and Huitt-Zollars is the design firm of record. The project was registered with TDLR on January 22, 2024.
Frequently Asked Questions
What is Valley Chile Road Reconstruction?
Valley Chile Road Reconstruction is a renovation/alteration project at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210 in Vinton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Operational improvements to Valley Chile Rd from Doniphan Dr to I-H 10 Frontage Rd. The project will include concrete pavement, drainage improvements, dual left turn lane, sidewalk, ADA ramps, signage & pavemt mrk and safety lighting.
Is Valley Chile Road Reconstruction open in Vinton?
Valley Chile Road Reconstruction is still under construction in Vinton, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is Valley Chile Road Reconstruction located?
Valley Chile Road Reconstruction is located at 100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, TX, 79821, in El Paso County.
Who is the owner or developer of Valley Chile Road Reconstruction?
Village of Vinton is the property owner/developer of record for Valley Chile Road Reconstruction, per its TDLR project registration.
Who is the architect or design firm for Valley Chile Road Reconstruction?
Huitt-Zollars is the design firm of record for Valley Chile Road Reconstruction, according to its TDLR filing.
How much does Valley Chile Road Reconstruction cost and how big is it?
Valley Chile Road Reconstruction has an estimated construction value of $7.0M and approximately 255,000 square feet (about $27/sqft), based on its TDLR filing.
Scope of Work
Operational improvements to Valley Chile Rd from Doniphan Dr to I-H 10 Frontage Rd. The project will include concrete pavement, drainage improvements, dual left turn lane, sidewalk, ADA ramps, signage & pavemt mrk and safety lighting.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
100 to 591 Valley Chile Rd 5822 Cromo Dr,, Suite 210, Vinton, TX, 79821
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 79821 (Vinton)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Vinton?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.