Project intelligenceTDLR TABS2024010007New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Jayton-Girard ISD Bleacher Facade and Site Improvements

700 Madison Ave, PO Box 168, Jayton, TX, 79528

Construction complete · Aug 2024Project Closed

Jayton-Girard ISD Bleacher Facade and Site Improvements is a new construction project at 700 Madison Ave, PO Box 168, Jayton, in Kent County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $4.0M across about 47,372 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
47,372 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$84/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 24, 2024199 days across supplied datesAug 10, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    192 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79528 (Jayton)

One email per change. Unsubscribe in one click. Privacy.

Jayton-Girard ISD Bleacher Facade and Site Improvements is a New Construction project located at 700 Madison Ave, PO Box 168, Jayton, TX 79528 in Jayton, Texas. The project has an estimated value of $4.0M covering 47,372 sq ft. Jayton-Girard ISD is the property owner and MWM Architects, Inc. is the design firm of record. The project was registered with TDLR on January 24, 2024.

Frequently Asked Questions

What is Jayton-Girard ISD Bleacher Facade and Site Improvements?

Jayton-Girard ISD Bleacher Facade and Site Improvements is a new construction project at 700 Madison Ave, PO Box 168 in Jayton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 700+ seat aluminum stadium bleacher system, masonry facade with 2 storage rooms, site parking improvements. 40,722sf parking & drive; 6,650sf seating & storage

Is Jayton-Girard ISD Bleacher Facade and Site Improvements open in Jayton?

Construction on Jayton-Girard ISD Bleacher Facade and Site Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.

Where is Jayton-Girard ISD Bleacher Facade and Site Improvements located?

Jayton-Girard ISD Bleacher Facade and Site Improvements is located at 700 Madison Ave, PO Box 168, Jayton, TX, 79528, in Kent County.

Who is the owner or developer of Jayton-Girard ISD Bleacher Facade and Site Improvements?

Jayton-Girard ISD is the property owner/developer of record for Jayton-Girard ISD Bleacher Facade and Site Improvements, per its TDLR project registration.

Who is the architect or design firm for Jayton-Girard ISD Bleacher Facade and Site Improvements?

MWM Architects, Inc. is the design firm of record for Jayton-Girard ISD Bleacher Facade and Site Improvements, according to its TDLR filing.

How much does Jayton-Girard ISD Bleacher Facade and Site Improvements cost and how big is it?

Jayton-Girard ISD Bleacher Facade and Site Improvements has an estimated construction value of $4.0M and approximately 47,372 square feet (about $84/sqft), based on its TDLR filing.

Scope of Work

New 700+ seat aluminum stadium bleacher system, masonry facade with 2 storage rooms, site parking improvements. 40,722sf parking & drive; 6,650sf seating & storage

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

700 Madison Ave, PO Box 168, Jayton, TX, 79528

33.25286, -100.58217

Watch all construction in 79528 (Jayton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.