Project intelligenceTDLR TABS2024010457Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

H. Grady Spruce High School Additions & Renovations in Dallas, TX

9733 Old Seagoville Road, Dallas, TX, 75217

Target date passed (Jan 2026)Review Complete

H. Grady Spruce High School Additions & Renovations is a additions to existing building project at 9733 Old Seagoville Road, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $37.0M across about 41,134 sq ft.

Estimated project value
$37.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
41,134 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$899/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 30, 2024731 days across supplied datesJan 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    125 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    606 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About H. Grady Spruce High School Additions & Renovations

H. Grady Spruce High School in Dallas is undergoing a major expansion and renovation project with an estimated cost of $37,000,000. The work includes additions totaling 41,134 square feet, specifically for Athletic and Resource Center facilities. This scope also covers extensive renovations to the existing school building, including partial facade replacement, light fixture updates, and flooring replacement. The project is registered with TDLR under the name H. Grady Spruce High School Additions & Renovations.

Project Scope and Ownership

The Dallas Independent School District is the owner of record for this development. Brown Reynolds Watford Architects serves as the design firm of record. Marcela Abadi Rhoads is the registered accessibility specialist associated with the filing. The site is located at 9733 Old Seagoville Road in Dallas County. The project involves public funds and public land, reflecting its status as a public school infrastructure improvement.

Construction was scheduled to begin in June 2024, following the completion of plan review in January 2024. The initial filing indicated a completion date of January 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. This means the physical status of the building remains unverified by the state’s final review process.

Scale and Regional Context

The estimated cost of $37,000,000 places this project in the top quarter of similar filings in Dallas County. The median estimated cost for additions to existing buildings in the county is $632,000. The scheduled build window of 606 days is longer than the county median of 182 days. The cost per square foot is $899, which is above the county median of $161 per square foot. These figures reflect the scale and complexity of the work relative to typical local projects.

Dallas Independent School District has six other TDLR-registered projects totaling $105,659,900. These include Obadiah Knight Elementary School and Woodrow Wilson High School. Brown Reynolds Watford Architects has worked on six other registered projects totaling $33,411,600, including the Bedford Performing Arts Center. The site is located in ZIP code 75217, which has a population of about 84,578 and a median household income of $52,987 according to U.S. Census estimates. The area is mostly owner-occupied housing.

This geographic detail is part of the public record for the site. The Dallas County unemployment rate was 3.3 percent in July 2026, higher than a year earlier. This labor market context is provided for reference regarding the regional economic environment during the construction period.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75217 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

H. Grady Spruce High School Additions & Renovations is a Additions to Existing Building project located at 9733 Old Seagoville Road, Dallas, TX 75217 in Dallas, Texas. The project has an estimated value of $37.0M covering 41,134 sq ft. Dallas Independent School District is the property owner and Brown Reynolds Watford Architects is the design firm of record. The project was registered with TDLR on January 30, 2024.

Frequently Asked Questions

Is H. Grady Spruce High School open?

The TDLR record has not yet recorded a final inspection, so the operational status is not confirmed. The project is a construction filing, not a business listing. Check with the school district for current access information.

Who is building H. Grady Spruce High School?

The owner is Dallas Independent School District. The design firm is Brown Reynolds Watford Architects. Marcela Abadi Rhoads is the registered accessibility specialist. The specific general contractor is not listed in the provided facts.

How big is the H. Grady Spruce High School project?

The project involves 41,134 square feet of additions. It also includes renovations to the existing building. The estimated cost is $37,000,000. This is significantly larger than the median project size in Dallas County.

When was the H. Grady Spruce High School project registered?

The project was registered with TDLR in January 2024. Plan review was completed in January 2024. Construction was scheduled to start in June 2024. The initial completion date was January 2026.

What is the address of H. Grady Spruce High School?

The address is 9733 Old Seagoville Road, Dallas, TX 75217. It is located in Dallas County. The site is in the 75217 ZIP code area, which has a population of about 84,578.

What is H. Grady Spruce High School Additions & Renovations?

H. Grady Spruce High School Additions & Renovations is a additions to existing building project at 9733 Old Seagoville Road in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Athletic and Resource Center Additions totaling 41,134 SF. Renovations and remodeling of existing school including partial facade replacement, light fixtures, flooring replacement, etc.

Is H. Grady Spruce High School Additions & Renovations open in Dallas?

H. Grady Spruce High School Additions & Renovations was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is H. Grady Spruce High School Additions & Renovations located?

H. Grady Spruce High School Additions & Renovations is located at 9733 Old Seagoville Road, Dallas, TX, 75217, in Dallas County.

Who is the owner or developer of H. Grady Spruce High School Additions & Renovations?

Dallas Independent School District is the property owner/developer of record for H. Grady Spruce High School Additions & Renovations, per its TDLR project registration.

Who is the architect or design firm for H. Grady Spruce High School Additions & Renovations?

Brown Reynolds Watford Architects is the design firm of record for H. Grady Spruce High School Additions & Renovations, according to its TDLR filing.

How much does H. Grady Spruce High School Additions & Renovations cost and how big is it?

H. Grady Spruce High School Additions & Renovations has an estimated construction value of $37.0M and approximately 41,134 square feet (about $899/sqft), based on its TDLR filing.

Scope of Work

Athletic and Resource Center Additions totaling 41,134 SF. Renovations and remodeling of existing school including partial facade replacement, light fixtures, flooring replacement, etc.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9733 Old Seagoville Road, Dallas, TX, 75217

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75217 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.