PR 29A (CSJ: 0624-01-003)
PR 29A (CSJ: 0624-01-003) is a new construction project at In Garner State Park, Concan, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $200K across about 5,418 sq ft.
๐Project Metrics
TDLR #TABS2024010558Review Complete
Design review complete, construction may proceed
PR 29A (CSJ: 0624-01-003) is a New Construction project located at In Garner State Park, Concan, TX 78838 in Concan, Texas. The project has an estimated value of $200K covering 5,418 sq ft. Texas Parks & Wildlife Department is the property owner and TxDOT District: San Antonio is the design firm of record. The project was registered with TDLR on January 31, 2024.
โFrequently Asked Questions
What is PR 29A (CSJ: 0624-01-003)?
PR 29A (CSJ: 0624-01-003) is a new construction project at In Garner State Park in Concan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace retaining wall and adjacent pedestrian walkway.
Is PR 29A (CSJ: 0624-01-003) open in Concan?
PR 29A (CSJ: 0624-01-003) is currently under construction in Concan, TX. Its current TDLR status is "Review Complete".
Where is PR 29A (CSJ: 0624-01-003) located?
PR 29A (CSJ: 0624-01-003) is located at In Garner State Park, Concan, TX, 78838, in Uvalde County.
Who is the owner or developer of PR 29A (CSJ: 0624-01-003)?
Texas Parks & Wildlife Department is the property owner/developer of record for PR 29A (CSJ: 0624-01-003), per its TDLR project registration.
Who is the architect or design firm for PR 29A (CSJ: 0624-01-003)?
TxDOT District: San Antonio is the design firm of record for PR 29A (CSJ: 0624-01-003), according to its TDLR filing.
How much does PR 29A (CSJ: 0624-01-003) cost and how big is it?
PR 29A (CSJ: 0624-01-003) has an estimated construction value of $200K and approximately 5,418 square feet (about $37/sqft), based on its TDLR filing.
๐Scope of Work
Replace retaining wall and adjacent pedestrian walkway.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 31, 2024
Review Complete
Jan 31, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$191.5M total๐๏ธSame Design Firm
$37.03B totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Uvalde County
Find General Contractors in Uvalde