Project intelligenceTDLR TABS2024010766Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Centerville ISD Campus Additions & Renovations

813 S. Commerce St, Centerville, TX, 75833

Construction complete · Jan 2026Project Closed

Centerville ISD Campus Additions & Renovations is a additions to existing building project at 813 S. Commerce St, Centerville, in Leon County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $25.0M across about 62,185 sq ft.

Estimated project value
$25.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
62,185 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$402/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 3, 2024713 days across supplied datesJan 16, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    486 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    169 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Centerville ISD Campus Additions & Renovations

The Centerville ISD Campus Additions & Renovations project represents a significant $25,000,000 investment in educational infrastructure at 813 S. Commerce St in Centerville, Texas. This construction effort focused on adding 62,185 sq ft of new space to the existing campus, specifically targeting the Annex, High School, and Cafeteria. The work involved comprehensive additions and renovations to these key facilities, expanding capacity and modernizing the learning environment for students in Leon County.

Design and Development

Centerville Independent School District served as the owner and developer of record for this major initiative. The design firm of record, Goodwin-Lasiter-Strong, brought extensive experience to the project, having been involved in six other TDLR-registered projects totaling $52,400,000. The estimated cost of $402 per square foot reflects the detailed scope of work required to integrate these new additions into the existing building structures while maintaining accessibility standards.

Melisa R Chapman served as the registered accessibility specialist, ensuring the project met all regulatory requirements. The project was registered with TDLR in February 2024, with construction commencing in April 2024. The filing indicated a planned completion date of July 2025, and the final inspection passed in that same month. The project utilized public funds and public land, underscoring its importance to the local community and its adherence to state oversight protocols.

Final Status and Context

TDLR closed the project file in January 2026, which marks the end of the accessibility review process for this construction. The official status is Project Closed. Centerville Independent School District has one other TDLR-registered project, the Centerville ISD High School, which totaled $200,000 and is also closed. Census estimates for ZIP 75833 show a population of about 3,143 and a median household income of $69,024. The Leon County unemployment rate was 4.2 percent in July 2026.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75833 (Centerville)

One email per change. Unsubscribe in one click. Privacy.

Centerville ISD Campus Additions & Renovations is a Additions to Existing Building project located at 813 S. Commerce St, Centerville, TX 75833 in Centerville, Texas. The project has an estimated value of $25.0M covering 62,185 sq ft. Centerville Independent School District is the property owner and Goodwin-Lasiter-Strong is the design firm of record. The project was registered with TDLR on February 3, 2024.

Frequently Asked Questions

What is the current status of the Centerville ISD campus project?

The project is closed. TDLR closed the project file in January 2026, and the final inspection passed in July 2025.

What specific buildings were renovated at 813 S. Commerce St?

The scope included additions and renovations to the Annex, High School, and Cafeteria.

Is the Centerville ISD project complete?

Yes, the final inspection passed in July 2025, and TDLR closed the project file in January 2026.

What is Centerville ISD Campus Additions & Renovations?

Centerville ISD Campus Additions & Renovations is a additions to existing building project at 813 S. Commerce St in Centerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additions and renovations to Annex, High School & Cafeteria.

Is Centerville ISD Campus Additions & Renovations open in Centerville?

Construction on Centerville ISD Campus Additions & Renovations is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.

Where is Centerville ISD Campus Additions & Renovations located?

Centerville ISD Campus Additions & Renovations is located at 813 S. Commerce St, Centerville, TX, 75833, in Leon County.

Who is the owner or developer of Centerville ISD Campus Additions & Renovations?

Centerville Independent School District is the property owner/developer of record for Centerville ISD Campus Additions & Renovations, per its TDLR project registration.

Who is the architect or design firm for Centerville ISD Campus Additions & Renovations?

Goodwin-Lasiter-Strong is the design firm of record for Centerville ISD Campus Additions & Renovations, according to its TDLR filing.

How much does Centerville ISD Campus Additions & Renovations cost and how big is it?

Centerville ISD Campus Additions & Renovations has an estimated construction value of $25.0M and approximately 62,185 square feet (about $402/sqft), based on its TDLR filing.

Scope of Work

Additions and renovations to Annex, High School & Cafeteria.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

813 S. Commerce St, Centerville, TX, 75833

Location by street address

Watch all construction in 75833 (Centerville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Centerville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.