Project intelligenceTDLR TABS2024010910Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MISD Safety + Security Improvements- Marion MS

506 S Center St, Marion, TX, 78124

Construction complete · Aug 2024Project Closed

MISD Safety + Security Improvements- Marion MS is a renovation/alteration project at 506 S Center St, Marion, in Marion County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $1.6M across about 4,900 sq ft.

Estimated project value
$1.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,900 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$327/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 2024206 days across supplied datesAug 30, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    118 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78124 (Marion)

One email per change. Unsubscribe in one click. Privacy.

MISD Safety + Security Improvements- Marion MS is a Renovation/Alteration project located at 506 S Center St, Marion, TX 78124 in Marion, Texas. The project has an estimated value of $1.6M covering 4,900 sq ft. Marion ISD is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on February 6, 2024.

Frequently Asked Questions

What is MISD Safety + Security Improvements- Marion MS?

MISD Safety + Security Improvements- Marion MS is a renovation/alteration project at 506 S Center St in Marion, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing entry and admin suite to incorporate secured vestibule and increase ease of circulation.

Is MISD Safety + Security Improvements- Marion MS open in Marion?

Construction on MISD Safety + Security Improvements- Marion MS is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.

Where is MISD Safety + Security Improvements- Marion MS located?

MISD Safety + Security Improvements- Marion MS is located at 506 S Center St, Marion, TX, 78124, in Marion County.

Who is the owner or developer of MISD Safety + Security Improvements- Marion MS?

Marion ISD is the property owner/developer of record for MISD Safety + Security Improvements- Marion MS, per its TDLR project registration.

Who is the architect or design firm for MISD Safety + Security Improvements- Marion MS?

O'Connell Robertson is the design firm of record for MISD Safety + Security Improvements- Marion MS, according to its TDLR filing.

How much does MISD Safety + Security Improvements- Marion MS cost and how big is it?

MISD Safety + Security Improvements- Marion MS has an estimated construction value of $1.6M and approximately 4,900 square feet (about $327/sqft), based on its TDLR filing.

Scope of Work

Renovation of existing entry and admin suite to incorporate secured vestibule and increase ease of circulation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

506 S Center St, Marion, TX, 78124

Location by street address

Watch all construction in 78124 (Marion)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.