Ontic
Ontic is a renovation/alteration project at 4009 Marathon, Suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $75K across about 351 sq ft.
๐Project Metrics
TDLR #TABS2024011300Project Closed
Project has been completed and closed
Ontic is a Renovation/Alteration project located at 4009 Marathon, Suite 300, Austin, TX 78756 in Austin, Texas. The project has an estimated value of $75K covering 351 sq ft. Ontic is the property owner and CORGAN is the design firm of record. The project was registered with TDLR on February 12, 2024.
โFrequently Asked Questions
What is Ontic?
Ontic is a renovation/alteration project at 4009 Marathon, Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Convert two offices into one board room within an existing office space
Is Ontic open in Austin?
Construction on Ontic is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Where is Ontic located?
Ontic is located at 4009 Marathon, Suite 300, Austin, TX, 78756, in Travis County.
Who is the owner or developer of Ontic?
Ontic is the property owner/developer of record for Ontic, per its TDLR project registration.
Who is the architect or design firm for Ontic?
CORGAN is the design firm of record for Ontic, according to its TDLR filing.
How much does Ontic cost and how big is it?
Ontic has an estimated construction value of $75K and approximately 351 square feet (about $214/sqft), based on its TDLR filing.
๐Scope of Work
Convert two offices into one board room within an existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 12, 2024
Review Complete
Inspection Complete
Closed
Aug 26, 2024
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Install Level 2 EV Charger
Irrigation backflow ( DCVA ) is old and gate valves do not shut causing constant leak and high water bills muddy spot in yard during construction project . Need to install a new DCVA 1 and test.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system with ductwork
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system for the upstairs unit.