Project intelligenceTDLR TABS2024011743Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

TRIUMPH PUBLIC SCOOLS in Abilene, TX

221 Oak Street, Abilene, TX, 79602

Construction complete · May 2024Inspection Complete

TRIUMPH PUBLIC SCOOLS is a renovation/alteration project at 221 Oak Street, Abilene, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $551K across about 10,116 sq ft.

Estimated project value
$551K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,116 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$54/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 16, 202493 days across supplied datesMay 19, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    55 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79602 (Abilene)

One email per change. Unsubscribe in one click. Privacy.

TRIUMPH PUBLIC SCOOLS is a Renovation/Alteration project located at 221 Oak Street, Abilene, TX 79602 in Abilene, Texas. The project has an estimated value of $551K covering 10,116 sq ft. RICHARD BROWN is the property owner and The Warren Group Architects, Inc. is the design firm of record. The project was registered with TDLR on February 16, 2024.

Frequently Asked Questions

What is TRIUMPH PUBLIC SCOOLS?

TRIUMPH PUBLIC SCOOLS is a renovation/alteration project at 221 Oak Street in Abilene, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant finish-out to the existing building. The improvements consist of finishes upgrade to the existing classrooms, and the conversion of an existing classroom into restrooms for students. Building Exterior shall remain the same.

Is TRIUMPH PUBLIC SCOOLS open in Abilene?

Construction on TRIUMPH PUBLIC SCOOLS is complete — TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.

Where is TRIUMPH PUBLIC SCOOLS located?

TRIUMPH PUBLIC SCOOLS is located at 221 Oak Street, Abilene, TX, 79602, in Taylor County.

Who is the owner or developer of TRIUMPH PUBLIC SCOOLS?

RICHARD BROWN is the property owner/developer of record for TRIUMPH PUBLIC SCOOLS, per its TDLR project registration.

Who is the architect or design firm for TRIUMPH PUBLIC SCOOLS?

The Warren Group Architects, Inc. is the design firm of record for TRIUMPH PUBLIC SCOOLS, according to its TDLR filing.

How much does TRIUMPH PUBLIC SCOOLS cost and how big is it?

TRIUMPH PUBLIC SCOOLS has an estimated construction value of $551K and approximately 10,116 square feet (about $54/sqft), based on its TDLR filing.

Scope of Work

tenant finish-out to the existing building. The improvements consist of finishes upgrade to the existing classrooms, and the conversion of an existing classroom into restrooms for students. Building Exterior shall remain the same.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

221 Oak Street, Abilene, TX, 79602

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79602 (Abilene)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.