Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Valor Middle School in HEDWIG, TX
415 E FM 1518N, ST. HEDWIG, TX 78152, Saint, HEDWIG, TX, 78152
Valor Middle School is a new construction project at 415 E FM 1518N, ST. HEDWIG, TX 78152, Saint, HEDWIG, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $80.0M across about 158,000 sq ft.
- Estimated project value
- $80.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 158,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $506/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 11mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
60 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
698 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Valor Middle School
ECISD Valor Middle School in Saint Hedwig is a newly constructed educational facility located at 415 E FM 1518N. The project, filed under the name Valor Middle School, represents a significant infrastructure investment by the East Central Independent School District. This two-story building covers 158,000 square feet and includes extensive sitework to support the campus environment. The total estimated cost for the project stands at $80,000,000, resulting in a cost per square foot of $506. This figure is notably above the median of $115 per square foot for new construction projects in Bexar County.
Project Timeline and Status
The East Central Independent School District registered this project with the Texas Department of Licensing and Regulation (TDLR) in February 2024. Plan review was completed in the same month, allowing construction to begin in April 2024. The filing originally projected a completion date of March 2026. The building passed its final TDLR accessibility inspection in March 2026, so construction is complete. The TDLR status is now recorded as Inspection Complete, confirming that all regulatory accessibility requirements have been met.
Design and Regional Context
LPA, Inc. served as the design firm of record for this substantial educational facility. Jessica Trevino Hamm was the registered accessibility specialist overseeing the compliance aspects. The project involves public funds and public land, adhering to strict state standards. Located in ZIP code 78152, the site is in an area with a median household income of $102,212 and predominantly owner-occupied housing. The scheduled build window of 699 days was longer than the county median of 207 days, reflecting the complexity of a new school construction.
Third-party sources have tracked the project through various stages. A post by projects.constructconnect.com listed the ECISD Valor Middle School in Saint Hedwig with a bid date in February 2023. Additionally, elevatoruptime.com notes the building as a nearby tracked structure in Saint Hedwig. These records confirm the project's presence in the local construction market alongside other regional developments.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78152 (HEDWIG)
One email per change. Unsubscribe in one click. Privacy.
Valor Middle School is a New Construction project located at 415 E FM 1518N, ST. HEDWIG, TX 78152, Saint Hedwig, TX 78152 in HEDWIG, Texas. The project has an estimated value of $80.0M covering 158,000 sq ft. East Central Independent School District is the property owner and LPA, Inc is the design firm of record. The project was registered with TDLR on February 20, 2024.
Frequently Asked Questions
Who is the owner of this project?
The owner and developer of record is the East Central Independent School District.
When was construction completed?
Construction was completed in March 2026 after passing the final TDLR accessibility inspection.
What is the total estimated cost?
The estimated cost is $80,000,000 for the new construction of the 2-story middle school.
Is the business open?
The TDLR record covers construction only and does not record whether the business has started serving customers.
What is Valor Middle School?
Valor Middle School is a new construction project at 415 E FM 1518N, ST. HEDWIG, TX 78152, Saint in HEDWIG, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a 2-story Middle School for East Central Independent School District including sitework.
Is Valor Middle School open in HEDWIG?
Construction on Valor Middle School is complete — TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Where is Valor Middle School located?
Valor Middle School is located at 415 E FM 1518N, ST. HEDWIG, TX 78152, Saint, HEDWIG, TX, 78152, in Bexar County.
Who is the owner or developer of Valor Middle School?
East Central Independent School District is the property owner/developer of record for Valor Middle School, per its TDLR project registration.
Who is the architect or design firm for Valor Middle School?
LPA, Inc is the design firm of record for Valor Middle School, according to its TDLR filing.
How much does Valor Middle School cost and how big is it?
Valor Middle School has an estimated construction value of $80.0M and approximately 158,000 square feet (about $506/sqft), based on its TDLR filing.
Scope of Work
New construction of a 2-story Middle School for East Central Independent School District including sitework.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
415 E FM 1518N, ST. HEDWIG, TX 78152, Saint, HEDWIG, TX, 78152
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$388.5M totalWatch all construction in 78152 (HEDWIG)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in HEDWIG?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.