Starbucks Travel Center
Starbucks Travel Center is a renovation/alteration project at 11550 Benbrook Blvd, Benbrook, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $250K across about 1,590 sq ft.
๐Project Metrics
TDLR #TABS2024012349Project Closed
Project has been completed and closed
Starbucks Travel Center is a Renovation/Alteration project located at 11550 Benbrook Blvd, Benbrook, TX 76126 in Benbrook, Texas. The project has an estimated value of $250K covering 1,590 sq ft. ECONO-FUEL INC is the property owner and ID Studio4 is the design firm of record. The project was registered with TDLR on February 26, 2024.
โFrequently Asked Questions
What is Starbucks Travel Center?
Starbucks Travel Center is a renovation/alteration project at 11550 Benbrook Blvd in Benbrook, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant build out in a multi-tenant single story bldg
Is Starbucks Travel Center open in Benbrook?
Construction on Starbucks Travel Center is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is Starbucks Travel Center located?
Starbucks Travel Center is located at 11550 Benbrook Blvd, Benbrook, TX, 76126, in Tarrant County.
Who is the owner or developer of Starbucks Travel Center?
ECONO-FUEL INC is the property owner/developer of record for Starbucks Travel Center, per its TDLR project registration.
Who is the architect or design firm for Starbucks Travel Center?
ID Studio4 is the design firm of record for Starbucks Travel Center, according to its TDLR filing.
How much does Starbucks Travel Center cost and how big is it?
Starbucks Travel Center has an estimated construction value of $250K and approximately 1,590 square feet (about $157/sqft), based on its TDLR filing.
๐Scope of Work
Tenant build out in a multi-tenant single story bldg
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 26, 2024
Review Complete
Inspection Complete
Closed
Sep 30, 2024