Stonegate Church - Phase I
4025 US-287, Midlothian, TX, 76065
Stonegate Church - Phase I is a renovation/alteration project at 4025 US-287, Midlothian, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $2.0M across about 34,807 sq ft.
- Estimated project value
- $2.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 34,807 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $57/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
26 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
136 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
507 days after the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76065 (Midlothian)
One email per change. Unsubscribe in one click. Privacy.
Stonegate Church - Phase I is a Renovation/Alteration project located at 4025 US-287, Midlothian, TX 76065 in Midlothian, Texas. The project has an estimated value of $2.0M covering 34,807 sq ft. Stonegate Church is the property owner and SPACE is the design firm of record. The project was registered with TDLR on March 6, 2024.
Frequently Asked Questions
What is Stonegate Church - Phase I?
Stonegate Church - Phase I is a renovation/alteration project at 4025 US-287 in Midlothian, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation to religious assembly auditorium and new construction of youth building.
Is Stonegate Church - Phase I open in Midlothian?
Construction on Stonegate Church - Phase I is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Stonegate Church - Phase I located?
Stonegate Church - Phase I is located at 4025 US-287, Midlothian, TX, 76065, in Ellis County.
Who is the owner or developer of Stonegate Church - Phase I?
Stonegate Church is the property owner/developer of record for Stonegate Church - Phase I, per its TDLR project registration.
Who is the architect or design firm for Stonegate Church - Phase I?
SPACE is the design firm of record for Stonegate Church - Phase I, according to its TDLR filing.
How much does Stonegate Church - Phase I cost and how big is it?
Stonegate Church - Phase I has an estimated construction value of $2.0M and approximately 34,807 square feet (about $57/sqft), based on its TDLR filing.
Scope of Work
Interior renovation to religious assembly auditorium and new construction of youth building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4025 US-287, Midlothian, TX, 76065
Related Projects
Same Owner
$5.5M totalNearby Projects
Within 1 kmWatch all construction in 76065 (Midlothian)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midlothian?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.