Construction complete ยท Aug 2025โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Thrall ISD Package D

201 S Bounds St, Thrall, TX 76578, Thrall, TX, 76578

Thrall ISD Package D is a new construction project at 201 S Bounds St, Thrall, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2025). The project has an estimated value of $3.9M across about 37,704 sq ft.

Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024013260
$3.9M
Project Value
37,704
Square Feet
$103/sqft
Cost/SqFt
1y 4mo
Duration
Registered:Mar 6, 2024
Start:May 15, 2024
Target:Aug 29, 2025
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

Thrall ISD Package D is a New Construction project located at 201 S Bounds St, Thrall, TX 76578 in Thrall, Texas. The project has an estimated value of $3.9M covering 37,704 sq ft. Thrall Isd is the property owner and Reliance Architecture LLC is the design firm of record. The project was registered with TDLR on March 6, 2024.

โ“Frequently Asked Questions

What is Thrall ISD Package D?

Thrall ISD Package D is a new construction project at 201 S Bounds St in Thrall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New concession & restrooms for Tiger Stadium, renovation of the existing Elementary school into a Middle School, renovation of the existing Administration building to update the current safety and/or security.

Is Thrall ISD Package D open in Thrall?

Construction on Thrall ISD Package D is complete โ€” TDLR records show the project passed its required accessibility inspection in Aug 2025. The building is finished and very likely open.

Where is Thrall ISD Package D located?

Thrall ISD Package D is located at 201 S Bounds St, Thrall, TX, 76578, in Williamson County.

Who is the owner or developer of Thrall ISD Package D?

Thrall Isd is the property owner/developer of record for Thrall ISD Package D, per its TDLR project registration.

Who is the architect or design firm for Thrall ISD Package D?

Reliance Architecture LLC is the design firm of record for Thrall ISD Package D, according to its TDLR filing.

How much does Thrall ISD Package D cost and how big is it?

Thrall ISD Package D has an estimated construction value of $3.9M and approximately 37,704 square feet (about $103/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

New concession & restrooms for Tiger Stadium, renovation of the existing Elementary school into a Middle School, renovation of the existing Administration building to update the current safety and/or security.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 6, 2024
Inspection Complete
August 29, 2025
Construction Start
May 15, 2024
Expected Completion
August 29, 2025

๐Ÿ“…Project Timeline

Filed

Mar 6, 2024

Review Complete

Inspection Complete

Aug 29, 2025

Closed

๐Ÿ“„Related City Permits

Building permits found at or near this location

2012 KAREN AVE

EXPRESS: Remodel 2 bathrooms replacing old pipes with new replacing electrical and installing new tile

ActiveBuilding PermitRepairJul 2026
$1
View Details
2026-095822 BP
๐Ÿ”งMaverick Construction
2015 FORD ST

ePlan: Residential Expedited Review - New construction of a 1-story single family residence with 3 bedroom 2.5 bath rear patio 1 car garage.

ActivePlumbing PermitNewJul 2026
View Details
2026-005469 PP
๐Ÿ”งAccent Plumbing, Inc.
2014 E 10TH ST

New pool for single family use. With plumbing permit.

ActiveElectrical PermitNewJul 2026
View Details
2026-007422 EP
๐Ÿ”งLED ES Electric
2010 S LAMAR BLVD UNIT 300

No construction proposed. CO request to occupy as is. Asking for CO for suite 300 only. Suite 325 is down for reference. Previously approved 2025 128890 PR permitted partitions and corridors for this suite. Office admin.

FinalBuilding PermitRemodelJul 2026
View Details
2026-045619 BP
๐Ÿ”งHarvey-Cleary Builders ***MAIN***
2013 RIVERVIEW ST

Interior remodel mold remediation due to leaks replace flooring cabinets drywall and exterior siding affected areas both baths floor and wall tile remove and replace replace shower valves replace approximately 6-8 studs on exterior walls that have rotting due to water damage on the front and rear walls. Those will need to be replaced with new boards.

ActiveBuilding PermitAddition and RemodelJul 2026
$1
View Details
2026-091606 BP
๐Ÿ”งCapital City Homes, LLC

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists