SEMINOLE ISD 2023 BOND CTE Center
2100 NW Avenue D, Seminole, TX, 79360
SEMINOLE ISD 2023 BOND CTE Center is a renovation/alteration project at 2100 NW Avenue D, Seminole, in Gaines County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $25.0M across about 64,222 sq ft.
- Estimated project value
- $25.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 64,222 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $389/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
865 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79360 (Seminole)
One email per change. Unsubscribe in one click. Privacy.
SEMINOLE ISD 2023 BOND CTE Center is a Renovation/Alteration project located at 2100 NW Avenue D, Seminole, TX 79360 in Seminole, Texas. The project has an estimated value of $25.0M covering 64,222 sq ft. SEMINOLE ISD is the property owner and PARKHILL is the design firm of record. The project was registered with TDLR on March 8, 2024.
Frequently Asked Questions
What is SEMINOLE ISD 2023 BOND CTE Center?
SEMINOLE ISD 2023 BOND CTE Center is a renovation/alteration project at 2100 NW Avenue D in Seminole, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CTE Center Addition & Renovation - 47,017 sq ft and addition of 17,205 sq ft to include vertical building construction, site work, landscaping, paving, and site utilities.
Is SEMINOLE ISD 2023 BOND CTE Center open in Seminole?
SEMINOLE ISD 2023 BOND CTE Center was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is SEMINOLE ISD 2023 BOND CTE Center located?
SEMINOLE ISD 2023 BOND CTE Center is located at 2100 NW Avenue D, Seminole, TX, 79360, in Gaines County.
Who is the owner or developer of SEMINOLE ISD 2023 BOND CTE Center?
SEMINOLE ISD is the property owner/developer of record for SEMINOLE ISD 2023 BOND CTE Center, per its TDLR project registration.
Who is the architect or design firm for SEMINOLE ISD 2023 BOND CTE Center?
PARKHILL is the design firm of record for SEMINOLE ISD 2023 BOND CTE Center, according to its TDLR filing.
How much does SEMINOLE ISD 2023 BOND CTE Center cost and how big is it?
SEMINOLE ISD 2023 BOND CTE Center has an estimated construction value of $25.0M and approximately 64,222 square feet (about $389/sqft), based on its TDLR filing.
Scope of Work
CTE Center Addition & Renovation - 47,017 sq ft and addition of 17,205 sq ft to include vertical building construction, site work, landscaping, paving, and site utilities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2100 NW Avenue D, Seminole, TX, 79360
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$45.8M totalWatch all construction in 79360 (Seminole)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Seminole?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.