LHS Athletics Additions and Renovations - Phase 1B
๐Project Metrics
TDLR #TABS2024013472Project Closed
Project has been completed and closed
๐Scope of Work
Add a new Weight Room, Auxiliary Gym and Football lockers. Add a Lobby, restrooms and concession to the Athletics area and minor upgrades to the Performing Arts Center entrance.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$100.0M total๐Related City Permits
Building permits found at or near this location
Installation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)
Installation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)
Installation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)
New inground swimming pool w/ reqd enclosure device for existing 2-story single family residence.
New inground swimming pool w/ reqd enclosure device for existing 2-story single family residence.