Dripping Springs Middle School - Capital Improvements and Renovations
๐Project Metrics
TDLR #TABS2024013518Project Closed
Project has been completed and closed
๐Scope of Work
The project consists of campus-wide finishes replacement, HVAC upgrades, a 350 sf secure entry vestibule addition and administration remodel of an existing 215,480 sf middle school. Site improvements include new landscape, new sidewalks, and minor re
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$80.3M total๐Related City Permits
Building permits found at or near this location
Express: Foundation Repair
Replace the sanitary sewer line for the clothes washer. We will route it thru the exterior wall down to under ground across the yard and connect to the sanitary sewer yard line. About 40 ft. In the back yard.
excavation of two tunnels to identify and rectify defects in the drainage system. The first tunnel will be constructed from the front yard following the cleanout and will extend 5 feet beneath the house to expose a break in the wye off the main drainage line. The second tunnel will be excavated from the left side of the house extending 5 feet to expose the bend in the hall toilet.
Requesting disconnect for main panel upgrade. No meter can replacement.
Excavate 20 tunnel to repair main drain line under house