UT-Jester City Dining Center Reno is a renovation/alteration project at 201 East 21st Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2025). The project has an estimated value of $2.4M across about 4,400 sq ft.
Project has been completed and closed
UT-Jester City Dining Center Reno is a Renovation/Alteration project located at 201 East 21st Street, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $2.4M covering 4,400 sq ft. University of Texas at Austin is the property owner and DLR Group is the design firm of record. The project was registered with TDLR on March 13, 2024.
UT-Jester City Dining Center Reno is a renovation/alteration project at 201 East 21st Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of space in dish room and dining hall for new soiled dish return conveyor system including a new pot wash sink.
Construction on UT-Jester City Dining Center Reno is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2025. The building is finished and very likely open.
UT-Jester City Dining Center Reno is located at 201 East 21st Street, Austin, TX, 78705, in Travis County.
University of Texas at Austin is the property owner/developer of record for UT-Jester City Dining Center Reno, per its TDLR project registration.
DLR Group is the design firm of record for UT-Jester City Dining Center Reno, according to its TDLR filing.
UT-Jester City Dining Center Reno has an estimated construction value of $2.4M and approximately 4,400 square feet (about $549/sqft), based on its TDLR filing.
Renovation of space in dish room and dining hall for new soiled dish return conveyor system including a new pot wash sink.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 13, 2024
Review Complete
Inspection Complete
Closed
Aug 11, 2025
Building permits found at or near this location
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Remove existing pool and replace with a new pool with the same specifications.
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Bldg 1 Pool (176sf)
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System