Chatime is a renovation/alteration project at 11411 Coit Road Suite 130, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $300K across about 1,681 sq ft.
๐Project Metrics
TDLR #TABS2024013772Project Closed
Project has been completed and closed
Chatime is a Renovation/Alteration project located at 11411 Coit Road Suite 130, Frisco, TX 75035 in Frisco, Texas. The project has an estimated value of $300K covering 1,681 sq ft. Coit Eldorado Retail, LLC is the property owner and Apogee is the design firm of record. The project was registered with TDLR on March 14, 2024.
โFrequently Asked Questions
What is Chatime?
Chatime is a renovation/alteration project at 11411 Coit Road Suite 130 in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of 1st gen. space to include front service counter, rear prep counter, addition of restrooms. No exterior scope to be done
Is Chatime open in Frisco?
Construction on Chatime is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Where is Chatime located?
Chatime is located at 11411 Coit Road Suite 130, Frisco, TX, 75035, in Collin County.
Who is the owner or developer of Chatime?
Coit Eldorado Retail, LLC is the property owner/developer of record for Chatime, per its TDLR project registration.
Who is the architect or design firm for Chatime?
Apogee is the design firm of record for Chatime, according to its TDLR filing.
How much does Chatime cost and how big is it?
Chatime has an estimated construction value of $300K and approximately 1,681 square feet (about $178/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of 1st gen. space to include front service counter, rear prep counter, addition of restrooms. No exterior scope to be done
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 14, 2024
Review Complete
Inspection Complete
Closed
Aug 6, 2024