Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
ACD SPC MTN Pkg 3 - MLK Campus in San Antonio, TX
1801 Martin Luther King Dr, San Antonio, TX, 78203
ACD SPC MTN Pkg 3 - MLK Campus is a renovation/alteration project at 1801 Martin Luther King Dr, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $8.3M across about 176,612 sq ft.
- Estimated project value
- $8.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 176,612 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $47/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
74 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
517 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78203 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
ACD SPC MTN Pkg 3 - MLK Campus is a Renovation/Alteration project located at 1801 Martin Luther King Dr, San Antonio, TX 78203 in San Antonio, Texas. The project has an estimated value of $8.3M covering 176,612 sq ft. Alamo College District - St Philips College is the property owner and PBK is the design firm of record. The project was registered with TDLR on March 19, 2024.
Frequently Asked Questions
What is ACD SPC MTN Pkg 3 - MLK Campus?
ACD SPC MTN Pkg 3 - MLK Campus is a renovation/alteration project at 1801 Martin Luther King Dr in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ASB - replacement of mechanical equipment, repair of damaged ceilings and enlargement of 2 mechanical room doors CDC - new finishes, reconfiguration of restrooms for ADA, replacement of mechanical equipment WCD - replacement of mechanica…
Is ACD SPC MTN Pkg 3 - MLK Campus open in San Antonio?
ACD SPC MTN Pkg 3 - MLK Campus was scheduled to finish construction in Oct 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is ACD SPC MTN Pkg 3 - MLK Campus located?
ACD SPC MTN Pkg 3 - MLK Campus is located at 1801 Martin Luther King Dr, San Antonio, TX, 78203, in Bexar County.
Who is the owner or developer of ACD SPC MTN Pkg 3 - MLK Campus?
Alamo College District - St Philips College is the property owner/developer of record for ACD SPC MTN Pkg 3 - MLK Campus, per its TDLR project registration.
Who is the architect or design firm for ACD SPC MTN Pkg 3 - MLK Campus?
PBK is the design firm of record for ACD SPC MTN Pkg 3 - MLK Campus, according to its TDLR filing.
How much does ACD SPC MTN Pkg 3 - MLK Campus cost and how big is it?
ACD SPC MTN Pkg 3 - MLK Campus has an estimated construction value of $8.3M and approximately 176,612 square feet (about $47/sqft), based on its TDLR filing.
Scope of Work
ASB - replacement of mechanical equipment, repair of damaged ceilings and enlargement of 2 mechanical room doors CDC - new finishes, reconfiguration of restrooms for ADA, replacement of mechanical equipment WCD - replacement of mechanical equipment
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1801 Martin Luther King Dr, San Antonio, TX, 78203
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$52.6M totalRelated City Permits
Building permits found at or near this location
SCH - School Site-ACCD-SPC-CHILD DEV CTR FLATWORK IMP
1801 MARTIN LUTHER KING DR
St Philip's Screen Power
SCH - ACCD-SPC Watson - Pkg#1- Blackbox Foundation
SCH - ACCD-SPC-Elect Plant-Bld# 15- Switchgear Upgrade
Watch all construction in 78203 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.