ACD SPC MTN Pkg 3 - MLK Campus
ACD SPC MTN Pkg 3 - MLK Campus is a renovation/alteration project at 1801 Martin Luther King Dr, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $8.3M across about 176,612 sq ft.
๐Project Metrics
TDLR #TABS2024014098Review Complete
Design review complete, construction may proceed
ACD SPC MTN Pkg 3 - MLK Campus is a Renovation/Alteration project located at 1801 Martin Luther King Dr, San Antonio, TX 78203 in San Antonio, Texas. The project has an estimated value of $8.3M covering 176,612 sq ft. Alamo College District - St Philips College is the property owner and PBK is the design firm of record. The project was registered with TDLR on March 19, 2024.
โFrequently Asked Questions
What is ACD SPC MTN Pkg 3 - MLK Campus?
ACD SPC MTN Pkg 3 - MLK Campus is a renovation/alteration project at 1801 Martin Luther King Dr in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ASB - replacement of mechanical equipment, repair of damaged ceilings and enlargement of 2 mechanical room doors CDC - new finishes, reconfiguration of restrooms for ADA, replacement of mechanical equipment WCD - replacement of mechanicaโฆ
Is ACD SPC MTN Pkg 3 - MLK Campus open in San Antonio?
ACD SPC MTN Pkg 3 - MLK Campus is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is ACD SPC MTN Pkg 3 - MLK Campus located?
ACD SPC MTN Pkg 3 - MLK Campus is located at 1801 Martin Luther King Dr, San Antonio, TX, 78203, in Bexar County.
Who is the owner or developer of ACD SPC MTN Pkg 3 - MLK Campus?
Alamo College District - St Philips College is the property owner/developer of record for ACD SPC MTN Pkg 3 - MLK Campus, per its TDLR project registration.
Who is the architect or design firm for ACD SPC MTN Pkg 3 - MLK Campus?
PBK is the design firm of record for ACD SPC MTN Pkg 3 - MLK Campus, according to its TDLR filing.
How much does ACD SPC MTN Pkg 3 - MLK Campus cost and how big is it?
ACD SPC MTN Pkg 3 - MLK Campus has an estimated construction value of $8.3M and approximately 176,612 square feet (about $47/sqft), based on its TDLR filing.
๐Scope of Work
ASB - replacement of mechanical equipment, repair of damaged ceilings and enlargement of 2 mechanical room doors CDC - new finishes, reconfiguration of restrooms for ADA, replacement of mechanical equipment WCD - replacement of mechanical equipment
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 19, 2024
Review Complete
Mar 19, 2024
Inspection Complete
Closed