Bonham ISD Additions and Renovations
1200 N Main St., Bonham, TX, 75418
Bonham ISD Additions and Renovations is a additions to existing building project at 1200 N Main St., Bonham, in Fannin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $53.7M across about 137,774 sq ft.
- Estimated project value
- $53.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 137,774 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $390/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
43 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
613 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1 days after the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75418 (Bonham)
One email per change. Unsubscribe in one click. Privacy.
Bonham ISD Additions and Renovations is a Additions to Existing Building project located at 1200 N Main St., Bonham, TX 75418 in Bonham, Texas. The project has an estimated value of $53.7M covering 137,774 sq ft. Bonham ISD is the property owner and WRA Architects is the design firm of record. The project was registered with TDLR on March 19, 2024.
Frequently Asked Questions
What is Bonham ISD Additions and Renovations?
Bonham ISD Additions and Renovations is a additions to existing building project at 1200 N Main St. in Bonham, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of a 2-story middle school building in Bonham, Texas. The additions will be approximately 108,359 Square Feet, 29,415 Square Feet existing building will be renovated. The total combined area of the project is 137,774…
Is Bonham ISD Additions and Renovations open in Bonham?
Construction on Bonham ISD Additions and Renovations is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Bonham ISD Additions and Renovations located?
Bonham ISD Additions and Renovations is located at 1200 N Main St., Bonham, TX, 75418, in Fannin County.
Who is the owner or developer of Bonham ISD Additions and Renovations?
Bonham ISD is the property owner/developer of record for Bonham ISD Additions and Renovations, per its TDLR project registration.
Who is the architect or design firm for Bonham ISD Additions and Renovations?
WRA Architects is the design firm of record for Bonham ISD Additions and Renovations, according to its TDLR filing.
How much does Bonham ISD Additions and Renovations cost and how big is it?
Bonham ISD Additions and Renovations has an estimated construction value of $53.7M and approximately 137,774 square feet (about $390/sqft), based on its TDLR filing.
Scope of Work
The project consists of a 2-story middle school building in Bonham, Texas. The additions will be approximately 108,359 Square Feet, 29,415 Square Feet existing building will be renovated. The total combined area of the project is 137,774 Square Feet.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1200 N Main St., Bonham, TX, 75418
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75418 (Bonham)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Bonham?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.