City of Marble Falls 2nd Street Improvements

2nd St. South ROW from Main St. to Ave. H, Marble Falls, TX, 78654

Construction complete · Sep 2026Project Closed

City of Marble Falls 2nd Street Improvements is a renovation/alteration project at 2nd St. South ROW from Main St. to Ave. H, Marble Falls, in Burnet County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $265K across about 2,917 sq ft.

Estimated project value
$265K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,917 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$91/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 20, 2024897 days across supplied datesSep 3, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    73 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    732 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About City of Marble Falls 2nd Street Improvements

The City of Marble Falls completed a $265,000 renovation along the South side of 2nd Street, a project that added sidewalks, crosswalks, and green space landscaping between Main Street and Avenue H. This 2,917 square foot improvement sits within the public right-of-way in Marble Falls, Texas, and was registered with the Texas Department of Licensing and Regulation (TDLR) in March 2024.

Schaumburg & Polk, Inc., served as the design firm of record for this renovation and alteration project. The scope focused specifically on enhancing pedestrian infrastructure and aesthetic elements on the south-facing side of the street. The work involved installing new sidewalks, marking crosswalks, and landscaping adjacent green spaces to improve the streetscape for both residents and visitors.

Construction began in June 2024, following the March registration. The scheduled build window was 92 days, which is close to the county median of 122 days for similar renovation filings in Burnet County. The estimated cost of $265,000 places this project near the median estimated cost of $300,000 for renovation and alteration projects in the county, with a median range of $150,000 to $750,000.

The cost per square foot for this project was $91, which is below the county median of $120 per square foot. This efficiency reflects the specific nature of the work, which prioritized surface improvements and landscaping over structural building alterations. The project utilized public funds and involved public land, consistent with municipal infrastructure upgrades in the area.

Project Status and Regional Context

The final inspection for this project passed in September 2024. TDLR closed the project file in September 2026, which marks the end of the accessibility review process for this construction. This closure confirms that all regulatory requirements for the sidewalk and landscaping improvements have been met and documented.

The City of Marble Falls has six other TDLR-registered projects totaling $21,451,309, including the Thunder Rock Sportsplex and Fire Station #2. Schaumburg & Polk, Inc. has completed five other projects in the region, ranging from street improvements in Alto to market street renovations in Mabank. Marble Falls, located in Burnet County, has a population of about 19,946 and a median household income of $72,669, according to U.S. Census estimates for ZIP 78654.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78654 (Marble Falls)

One email per change. Unsubscribe in one click. Privacy.

City of Marble Falls 2nd Street Improvements is a Renovation/Alteration project located at 2nd St. South ROW from Main St. to Ave. H, Marble Falls, TX 78654 in Marble Falls, Texas. The project has an estimated value of $265K covering 2,917 sq ft. City of Marble Falls is the property owner and Schaumburg & Polk, Inc. is the design firm of record. The project was registered with TDLR on March 20, 2024.

Frequently Asked Questions

What work was done on 2nd Street in Marble Falls?

The project included sidewalk installation, crosswalks, and green space landscaping along the South side of 2nd Street from Main Street to Avenue H. The total area improved was 2,917 square feet.

Who designed the 2nd Street improvements?

Schaumburg & Polk, Inc. was the design firm of record for this renovation and alteration project, which was funded by public sources.

When did the construction finish?

Construction started in June 2024 and the final inspection passed in September 2024. TDLR closed the project file in September 2026.

How much did the project cost?

The estimated cost was $265,000. This amount is close to the Burnet County median for similar renovation projects, which is $300,000.

Is the business open?

The TDLR record confirms the construction and inspection process was completed, but it does not provide information about specific business operating hours or openings.

What is City of Marble Falls 2nd Street Improvements?

City of Marble Falls 2nd Street Improvements is a renovation/alteration project at 2nd St. South ROW from Main St. to Ave. H in Marble Falls, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk installation, crosswalks, and green space landscaping along the South side of 2nd Street from Main Street to Avenue H. for a total of 2,917 square feet.

Is City of Marble Falls 2nd Street Improvements open in Marble Falls?

Construction on City of Marble Falls 2nd Street Improvements is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is City of Marble Falls 2nd Street Improvements located?

City of Marble Falls 2nd Street Improvements is located at 2nd St. South ROW from Main St. to Ave. H, Marble Falls, TX, 78654, in Burnet County.

Who is the owner or developer of City of Marble Falls 2nd Street Improvements?

City of Marble Falls is the property owner/developer of record for City of Marble Falls 2nd Street Improvements, per its TDLR project registration.

Who is the architect or design firm for City of Marble Falls 2nd Street Improvements?

Schaumburg & Polk, Inc. is the design firm of record for City of Marble Falls 2nd Street Improvements, according to its TDLR filing.

How much does City of Marble Falls 2nd Street Improvements cost and how big is it?

City of Marble Falls 2nd Street Improvements has an estimated construction value of $265K and approximately 2,917 square feet (about $91/sqft), based on its TDLR filing.

Scope of Work

Sidewalk installation, crosswalks, and green space landscaping along the South side of 2nd Street from Main Street to Avenue H. for a total of 2,917 square feet.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2nd St. South ROW from Main St. to Ave. H, Marble Falls, TX, 78654

Location by street address

Watch all construction in 78654 (Marble Falls)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Marble Falls?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.