Funding type
This project is privately funded, on private land for private use.
Silverado West Phase 7 Amenity Center in Aubrey, TX
3025 Pinecrest Drive, Aubrey, TX, 76227
Silverado West Phase 7 Amenity Center is a new construction project at 3025 Pinecrest Drive, Aubrey, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $3.0M across about 69,000 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 69,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $43/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
376 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About Silverado West Phase 7 Amenity Center
The Silverado West Phase 7 Amenity Center in Aubrey, Texas, is a new construction project spanning 69,000 square feet. Located at 3025 Pinecrest Drive in Denton County, the facility was developed by D.R. Horton - Texas LTD with an estimated cost of $3,000,000. The Texas Department of Licensing and Regulation closed the project file in March 2025, marking the end of the accessibility review process for this construction.
The scope of work includes a pool cabana, swimming pool, playground, splashpad, sidewalk, and parking. This privately funded development sits on private land for private use. The project was registered with TDLR in March 2024, with a scheduled build window of 376 days. The completion date on the filing was March 2025, and the TDLR status is Project Closed.
Project Scale and Cost Context
At $3,000,000, the estimated cost is above the county median for new construction in Denton County, placing it in the top quarter of similar filings. The cost per square foot is $43, which is below the county median of $121. The scheduled build window of 376 days is longer than the county median of 217 days. These figures are computed from 4,492 TDLR-registered new construction filings in the county.
D.R. Horton - Texas LTD has three other TDLR-registered projects totaling $7,250,000, including the High Country at Silverado Phase 2 Amenity Center in Aubrey. JBI Partners, the design firm of record, has six other TDLR-registered projects totaling $6,970,000, including work in Plano and Anna.
Local Area Profile
The ZIP code 76227 has a population of about 55,437 and a median household income of $107,065, according to U.S. Census ACS 2023 five-year estimates. The area contains 20,970 housing units, with a median owner-occupied home value of $376,200. Housing in this area is predominantly owner-occupied. The Denton County unemployment rate was 4.4 percent in June 2026, higher than a year earlier.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76227 (Aubrey)
One email per change. Unsubscribe in one click. Privacy.
Silverado West Phase 7 Amenity Center is a New Construction project located at 3025 Pinecrest Drive, Aubrey, TX 76227 in Aubrey, Texas. The project has an estimated value of $3.0M covering 69,000 sq ft. D.R. Horton - Texas LTD is the property owner and JBI Partners is the design firm of record. The project was registered with TDLR on March 20, 2024.
Frequently Asked Questions
What is the status of the Silverado West Phase 7 Amenity Center?
TDLR closed the project file in March 2025. This marks the end of the accessibility review process for this construction project in Aubrey.
Who owns the Silverado West Phase 7 Amenity Center?
D.R. Horton - Texas LTD is the owner and developer of record. The project is privately funded and located on private land for private use.
What features are included in the Silverado West Phase 7 Amenity Center?
The scope includes a pool cabana, swimming pool, playground, splashpad, sidewalk, and parking. The total square footage is 69,000 sq ft.
How much did the Silverado West Phase 7 Amenity Center cost to build?
The estimated cost is $3,000,000. This is above the Denton County median for new construction, with a cost per square foot of $43.
Is the Silverado West Phase 7 Amenity Center open to the public?
The TDLR record indicates the construction project file was closed in March 2025. The facts provided cover construction status and do not confirm current business operations or public access.
What is Silverado West Phase 7 Amenity Center?
Silverado West Phase 7 Amenity Center is a new construction project at 3025 Pinecrest Drive in Aubrey, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Amenity center with pool cabana, swimming pool, playground, splashpad, sidewalk and parking
Is Silverado West Phase 7 Amenity Center open in Aubrey?
Construction on Silverado West Phase 7 Amenity Center is complete — TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is Silverado West Phase 7 Amenity Center located?
Silverado West Phase 7 Amenity Center is located at 3025 Pinecrest Drive, Aubrey, TX, 76227, in Denton County.
Who is the owner or developer of Silverado West Phase 7 Amenity Center?
D.R. Horton - Texas LTD is the property owner/developer of record for Silverado West Phase 7 Amenity Center, per its TDLR project registration.
Who is the architect or design firm for Silverado West Phase 7 Amenity Center?
JBI Partners is the design firm of record for Silverado West Phase 7 Amenity Center, according to its TDLR filing.
How much does Silverado West Phase 7 Amenity Center cost and how big is it?
Silverado West Phase 7 Amenity Center has an estimated construction value of $3.0M and approximately 69,000 square feet (about $43/sqft), based on its TDLR filing.
Scope of Work
Amenity center with pool cabana, swimming pool, playground, splashpad, sidewalk and parking
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3025 Pinecrest Drive, Aubrey, TX, 76227
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$171.4M totalWatch all construction in 76227 (Aubrey)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Aubrey?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.