Zumiez
Zumiez is a renovation/alteration project at 11200 Lakeline Mall Drive, suite M-17, Cedar Creek, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $150K across about 2,500 sq ft.
๐Project Metrics
TDLR #TABS2024014361Project Closed
Project has been completed and closed
Zumiez is a Renovation/Alteration project located at 11200 Lakeline Mall Drive, suite M-17, Cedar Creek, TX 78613 in Cedar Creek, Texas. The project has an estimated value of $150K covering 2,500 sq ft. Simon Property Group is the property owner and PDMS Design Group is the design firm of record. The project was registered with TDLR on March 21, 2024.
โFrequently Asked Questions
What is Zumiez?
Zumiez is a renovation/alteration project at 11200 Lakeline Mall Drive, suite M-17 in Cedar Creek, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Remodel
Is Zumiez open in Cedar Creek?
Construction on Zumiez is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is Zumiez located?
Zumiez is located at 11200 Lakeline Mall Drive, suite M-17, Cedar Creek, TX, 78613, in Williamson County.
Who is the owner or developer of Zumiez?
Simon Property Group is the property owner/developer of record for Zumiez, per its TDLR project registration.
Who is the architect or design firm for Zumiez?
PDMS Design Group is the design firm of record for Zumiez, according to its TDLR filing.
How much does Zumiez cost and how big is it?
Zumiez has an estimated construction value of $150K and approximately 2,500 square feet (about $60/sqft), based on its TDLR filing.
๐Scope of Work
Interior Remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 21, 2024
Review Complete
Inspection Complete
Closed
Jun 22, 2024
๐Related Projects
๐คSame Owner
$163.2M total๐๏ธSame Design Firm
$590.3M total๐Related City Permits
Building permits found at or near this location
Interior non structural demolition
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 Ton 2 Stage Gas Horizontal System
Replacement of furnace only
Install Level 2 EV Charger
Commercial Roof Recover of existing low-slope roofing system. No structural modifications. No change to building footprint use or occupancy. (Macys Building)