Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Sienna Crossing Elementary School in Missouri City, TX
10011 Steep Bank Trace, Missouri City, TX, 77459
Sienna Crossing Elementary School is a renovation/alteration project at 10011 Steep Bank Trace, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $601K across about 3,840 sq ft.
- Estimated project value
- $601K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,840 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $157/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
72 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
213 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About Sienna Crossing Elementary School
Fort Bend Independent School District registered a $601,363 renovation project at Sienna Crossing Elementary School in Missouri City with the Texas Department of Licensing and Regulation. The scope of work involves placing a 48-foot by 80-foot canopy over the existing basketball court. This specific alteration covers 3,840 square feet and does not include work to the access walks.
The project was registered in March 2024, with construction starting in June 2024. The TDLR record shows a scheduled completion date of December 2024. TDLR closed the project file in December 2024, which marks the end of the accessibility review process for this construction.
Project Context and Cost
At $601,363, the estimated cost is above the county median for renovation and alteration filings in Fort Bend County. The median estimated cost for similar projects in the area is $239,750. The cost per square foot for this canopy project is $157, which is higher than the county median of $80 per square foot.
The scheduled build window for this project was 213 days, which is longer than the county median of 92 days for similar filings. RDLR Architects is the design firm of record for this project. William T Winning served as the registered accessibility specialist.
School and District Background
Sienna Crossing Elementary School is located at 10011 Steep Bank Trace in Missouri City. The school is part of the Fort Bend Independent School District. According to Niche, the school is a public institution with a student population of 1,035 across grades PK through 5.
Fort Bend ISD has other TDLR-registered projects, including a $29,100,000 Aquatic Practice Facility in Fresno and a $7,000,000 Special Education Transportation Center in Sugar Land. RDLR Architects has also designed other projects for the district, such as the Progressive High School in Missouri City.
The surrounding ZIP code 77459 has a median household income of $132,758 and a median owner-occupied home value of $367,700, according to U.S. Census estimates. The area is predominantly owner-occupied housing with a population of about 81,251.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77459 (Missouri City)
One email per change. Unsubscribe in one click. Privacy.
Sienna Crossing Elementary School is a Renovation/Alteration project located at 10011 Steep Bank Trace, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $601K covering 3,840 sq ft. Fort Bend Independent School District is the property owner and RDLR Architects is the design firm of record. The project was registered with TDLR on March 21, 2024.
Frequently Asked Questions
What is the status of the Sienna Crossing Elementary renovation?
TDLR closed the project file in December 2024. This marks the end of the accessibility review process for the construction of the basketball court canopy.
Who is the owner of the Sienna Crossing Elementary project?
Fort Bend Independent School District is the owner and developer of record for this renovation and alteration project in Missouri City.
What is the estimated cost of the canopy project?
The estimated cost is $601,363. This figure is above the county median for similar renovation and alteration filings in Fort Bend County.
Who is the design firm for this project?
RDLR Architects is the design firm of record for the Sienna Crossing Elementary School renovation project.
Is the school open?
The TDLR record only covers the construction status. Niche describes Sienna Crossing Elementary School as a highly rated public school with 1,035 students.
What is Sienna Crossing Elementary School?
Sienna Crossing Elementary School is a renovation/alteration project at 10011 Steep Bank Trace in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Placing a 48’x80’ canopy over an existing basketball court; no work to the access walks.
Is Sienna Crossing Elementary School open in Missouri City?
Construction on Sienna Crossing Elementary School is complete — TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Sienna Crossing Elementary School located?
Sienna Crossing Elementary School is located at 10011 Steep Bank Trace, Missouri City, TX, 77459, in Fort Bend County.
Who is the owner or developer of Sienna Crossing Elementary School?
Fort Bend Independent School District is the property owner/developer of record for Sienna Crossing Elementary School, per its TDLR project registration.
Who is the architect or design firm for Sienna Crossing Elementary School?
RDLR Architects is the design firm of record for Sienna Crossing Elementary School, according to its TDLR filing.
How much does Sienna Crossing Elementary School cost and how big is it?
Sienna Crossing Elementary School has an estimated construction value of $601K and approximately 3,840 square feet (about $157/sqft), based on its TDLR filing.
Scope of Work
Placing a 48’x80’ canopy over an existing basketball court; no work to the access walks.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
10011 Steep Bank Trace, Missouri City, TX, 77459
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$47.53B totalWatch all construction in 77459 (Missouri City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Missouri City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.