Brackenridge HS Bond 2020-Athletics Addition & Renovations in San Antonio, TX
400 Eagleland Dr, San Antonio, TX, 78210
Brackenridge HS Bond 2020-Athletics Addition & Renovations is a renovation/alteration project at 400 Eagleland Dr, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $29.0M across about 71,455 sq ft.
- Estimated project value
- $29.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 71,455 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $406/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
101 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
548 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
9 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
267 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Brackenridge HS Bond 2020-Athletics Addition & Renovations
San Antonio Independent School District completed a $29,000,000 renovation and alteration project at Brackenridge High School, located at 400 Eagleland Dr in San Antonio, TX 78210. The work involved a total of 71,455 sq ft across three buildings, including the construction of a new gym and dance studio in Building D, as well as interior remodels and alterations to existing athletic buildings E and F.
The project, filed under the name Brackenridge HS Bond 2020-Athletics Addition & Renovations, was registered with TDLR in March 2024. Construction began in July 2024, and the filing indicated a completion date of December 2025. The final inspection passed in January 2026. TDLR closed the project file in October 2026, which marks the end of the accessibility review process for this construction.
Design and Cost Context
Stantec Architecture Inc. served as the design firm of record for this project. Stephen A Meyer was the registered accessibility specialist. The estimated cost of $29,000,000 places this project in the top quarter of estimated costs for renovation and alteration filings in Bexar County, where the median is $250,000. The cost per square foot is $406, which is above the county median of $85 per square foot for similar projects.
The scheduled build window for this project was 548 days, which is longer than the county median of 103 days for renovation and alteration filings. San Antonio Independent School District has six other TDLR-registered projects in San Antonio, totaling $35,450,000, including renovations at Sydney Lanier High School and Highlands High School. Stantec Architecture Inc. has six other TDLR-registered projects totaling $88,490,729, including the Polytechnic Pyramid Middle School in Fort Worth.
City of San Antonio permit records show one permit on file at this street address, issued between July 2025 and July 2025, for an On Premise Sign. The project is privately funded on private land for private use. The area profile for ZIP 78210 indicates a population of about 34,740 and a median household income of $51,990, according to U.S. Census ACS 2023 five-year estimates.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78210 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
Brackenridge HS Bond 2020-Athletics Addition & Renovations is a Renovation/Alteration project located at 400 Eagleland Dr, San Antonio, TX 78210 in San Antonio, Texas. The project has an estimated value of $29.0M covering 71,455 sq ft. San Antonio Independent School District is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on March 22, 2024.
Frequently Asked Questions
What is the current status of the Brackenridge High School renovation?
TDLR closed the project file in October 2026, marking the end of the accessibility review process. The final inspection passed in January 2026.
What buildings were renovated at Brackenridge High School?
The scope included a new gym and dance studio in Building D, and interior remodels of existing athletic buildings E and F.
Who was the design firm for this project?
Stantec Architecture Inc. was the design firm of record for the Brackenridge High School renovation.
When did construction start and finish?
Construction began in July 2024. The filing indicated a completion date of December 2025, and the final inspection passed in January 2026.
What is Brackenridge HS Bond 2020-Athletics Addition & Renovations?
Brackenridge HS Bond 2020-Athletics Addition & Renovations is a renovation/alteration project at 400 Eagleland Dr in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 71,455 sf total for all 3 building. Construct new gym & dance studio, bldg D, Interior remodel /alteration of two existing athletic buildings,bldgs E & F.
Is Brackenridge HS Bond 2020-Athletics Addition & Renovations open in San Antonio?
Construction on Brackenridge HS Bond 2020-Athletics Addition & Renovations is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is Brackenridge HS Bond 2020-Athletics Addition & Renovations located?
Brackenridge HS Bond 2020-Athletics Addition & Renovations is located at 400 Eagleland Dr, San Antonio, TX, 78210, in Bexar County.
Who is the owner or developer of Brackenridge HS Bond 2020-Athletics Addition & Renovations?
San Antonio Independent School District is the property owner/developer of record for Brackenridge HS Bond 2020-Athletics Addition & Renovations, per its TDLR project registration.
Who is the architect or design firm for Brackenridge HS Bond 2020-Athletics Addition & Renovations?
Stantec Architecture Inc. is the design firm of record for Brackenridge HS Bond 2020-Athletics Addition & Renovations, according to its TDLR filing.
How much does Brackenridge HS Bond 2020-Athletics Addition & Renovations cost and how big is it?
Brackenridge HS Bond 2020-Athletics Addition & Renovations has an estimated construction value of $29.0M and approximately 71,455 square feet (about $406/sqft), based on its TDLR filing.
Scope of Work
71,455 sf total for all 3 building. Construct new gym & dance studio, bldg D, Interior remodel /alteration of two existing athletic buildings,bldgs E & F.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
400 Eagleland Dr, San Antonio, TX, 78210
Related Projects
Same Owner
$1.13B totalRelated City Permits
Building permits found at or near this location
400 EAGLELAND DR
Watch all construction in 78210 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.