Project intelligenceTDLR TABS2024015094New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Trail-Fairmont Parkway-2022

Fairmont Parkway from SH 146 to Sylvan Beach Park, La Porte, TX, 77571

Construction complete · Aug 2026Inspection Complete

Trail-Fairmont Parkway-2022 is a new construction project at Fairmont Parkway from SH 146 to Sylvan Beach Park, La Porte, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.0M across about 30,300 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
30,300 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$33/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 1, 2024854 days across supplied datesAug 3, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    63 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    609 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77571 (La Porte)

One email per change. Unsubscribe in one click. Privacy.

Trail-Fairmont Parkway-2022 is a New Construction project located at Fairmont Parkway from SH 146 to Sylvan Beach Park, La Porte, TX 77571 in La Porte, Texas. The project has an estimated value of $1.0M covering 30,300 sq ft. Harris County Engineering Department is the property owner and TGI Engineering & Consulting is the design firm of record. The project was registered with TDLR on April 1, 2024.

Frequently Asked Questions

What is Trail-Fairmont Parkway-2022?

Trail-Fairmont Parkway-2022 is a new construction project at Fairmont Parkway from SH 146 to Sylvan Beach Park in La Porte, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement and construction of 30,300 sf of reinforced concrete sidewalks, driveways and ADA compliant curb ramps along Fairmont Parkway from SH 146 to Sylvan Beach Park in La Porte, Texas

Is Trail-Fairmont Parkway-2022 open in La Porte?

Construction on Trail-Fairmont Parkway-2022 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Trail-Fairmont Parkway-2022 located?

Trail-Fairmont Parkway-2022 is located at Fairmont Parkway from SH 146 to Sylvan Beach Park, La Porte, TX, 77571, in Harris County.

Who is the owner or developer of Trail-Fairmont Parkway-2022?

Harris County Engineering Department is the property owner/developer of record for Trail-Fairmont Parkway-2022, per its TDLR project registration.

Who is the architect or design firm for Trail-Fairmont Parkway-2022?

TGI Engineering & Consulting is the design firm of record for Trail-Fairmont Parkway-2022, according to its TDLR filing.

How much does Trail-Fairmont Parkway-2022 cost and how big is it?

Trail-Fairmont Parkway-2022 has an estimated construction value of $1.0M and approximately 30,300 square feet (about $33/sqft), based on its TDLR filing.

Scope of Work

Replacement and construction of 30,300 sf of reinforced concrete sidewalks, driveways and ADA compliant curb ramps along Fairmont Parkway from SH 146 to Sylvan Beach Park in La Porte, Texas

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Fairmont Parkway from SH 146 to Sylvan Beach Park, La Porte, TX, 77571

Location by street address

Watch all construction in 77571 (La Porte)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in La Porte?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.