Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Construct New Port Coordination Center Facility at the Turning Basin
111 East Loop North, Houston, TX, 77029
Construct New Port Coordination Center Facility at the Turning Basin is a new construction project at 111 East Loop North, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $13.0M across about 35,257 sq ft.
- Estimated project value
- $13.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 35,257 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $369/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
127 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
754 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77029 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Construct New Port Coordination Center Facility at the Turning Basin is a New Construction project located at 111 East Loop North, Houston, TX 77029 in Houston, Texas. The project has an estimated value of $13.0M covering 35,257 sq ft. Port of Houston Authority is the property owner and English + Associates is the design firm of record. The project was registered with TDLR on April 3, 2024.
Frequently Asked Questions
What is Construct New Port Coordination Center Facility at the Turning Basin?
Construct New Port Coordination Center Facility at the Turning Basin is a new construction project at 111 East Loop North in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 2-story concrete tilt-wall office building and connected garage/apparatus bay. 35,257 sq feet.
Is Construct New Port Coordination Center Facility at the Turning Basin open in Houston?
Construct New Port Coordination Center Facility at the Turning Basin was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Construct New Port Coordination Center Facility at the Turning Basin located?
Construct New Port Coordination Center Facility at the Turning Basin is located at 111 East Loop North, Houston, TX, 77029, in Harris County.
Who is the owner or developer of Construct New Port Coordination Center Facility at the Turning Basin?
Port of Houston Authority is the property owner/developer of record for Construct New Port Coordination Center Facility at the Turning Basin, per its TDLR project registration.
Who is the architect or design firm for Construct New Port Coordination Center Facility at the Turning Basin?
English + Associates is the design firm of record for Construct New Port Coordination Center Facility at the Turning Basin, according to its TDLR filing.
How much does Construct New Port Coordination Center Facility at the Turning Basin cost and how big is it?
Construct New Port Coordination Center Facility at the Turning Basin has an estimated construction value of $13.0M and approximately 35,257 square feet (about $369/sqft), based on its TDLR filing.
Scope of Work
New 2-story concrete tilt-wall office building and connected garage/apparatus bay. 35,257 sq feet.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
111 East Loop North, Houston, TX, 77029
Related Projects
Same Owner
$128.5M totalWatch all construction in 77029 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.