Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Bowie Street & York Street Emergency Water Repairs [CIP 252]
Bowie Street - Lovers to Pinson; York Street, Forney, TX, 75126
Bowie Street & York Street Emergency Water Repairs [CIP 252] is a new construction project at Bowie Street - Lovers to Pinson; York Street, Forney, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $3.8M across about 1,400 sq ft.
- Estimated project value
- $3.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,400 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2.68K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
52 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
611 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
89 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
134 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Bowie Street & York Street Emergency Water Repairs [CIP 252]
The City of Forney completed the Sidewalk & Pedestrian Facilities in Bowie Street and York Street project, a $3,750,000 new construction effort in Kaufman County. The work involved installing approximately 1,400 square feet of new 5-foot wide sidewalk and curb ramps along street segments that previously lacked pedestrian infrastructure. This project is now fully finished, with the Texas Department of Licensing and Regulation (TDLR) closed the project file in September 2026.
Project Scope and Design
Freeman-Millican, Inc. served as the design firm of record for this accessibility-focused construction. The registered accessibility specialist, Sharlynn L Keys, oversaw the compliance aspects of the work. The filing, registered in April 2024, identified the work as "Bowie Street & York Street Emergency Water Repairs [CIP 252]" but the actual scope focused on pedestrian safety. The estimated cost of $3,750,000 reflects the specialized nature of the curb ramps and sidewalk installation required to meet accessibility standards.
Construction began in June 2024, following plan review completion in April 2024. The scheduled build window spanned 611 days, which is longer than the 242-day median for similar new construction filings in Kaufman County. The final inspection passed in May 2026, confirming that the installed facilities met all necessary regulatory requirements before the TDLR closed the project file.
Regional Context and Funding
This project utilized public funds and public land, aligning with the City of Forney's broader development goals. The City has six other TDLR-registered projects totaling $20,075,000, including fire station improvements and community park developments. The $2,679 per square foot cost for this project is above the county median of $144 per square foot, a difference driven by the specialized accessibility features and the lack of prior sidewalk infrastructure in these specific street segments.
The project addresses pedestrian needs in a ZIP code area with a median household income of $104,001 and a population of approximately 77,116 residents. By adding sidewalks to Bowie Street and York Street, the City of Forney has improved safe walking access for residents in Kaufman County. The completion of this project marks the end of the accessibility review process, ensuring that these new facilities remain compliant with state standards.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75126 (Forney)
One email per change. Unsubscribe in one click. Privacy.
Bowie Street & York Street Emergency Water Repairs [CIP 252] is a New Construction project located at Bowie Street - Lovers to Pinson; York Street, Forney, TX 75126 in Forney, Texas. The project has an estimated value of $3.8M covering 1,400 sq ft. City of Forney is the property owner and Freeman-Millican, Inc. is the design firm of record. The project was registered with TDLR on April 10, 2024.
Frequently Asked Questions
Is the sidewalk project on Bowie Street complete?
Yes, the Sidewalk & Pedestrian Facilities in Bowie Street and York Street project is finished. The final inspection passed in May 2026, and TDLR closed the project file in September 2026.
Who designed the Forney sidewalk project?
Freeman-Millican, Inc. is the design firm of record. Sharlynn L Keys served as the registered accessibility specialist for the project.
How much did the Forney sidewalk project cost?
The estimated cost was $3,750,000. This figure covers the installation of approximately 1,400 square feet of new sidewalk and curb ramps.
When did construction start for this project?
Construction started in June 2024. Plan review was completed in April 2024, shortly after the project was registered with TDLR.
Who owns the sidewalk project on York Street?
The City of Forney is the owner and developer of record for this public infrastructure project in Kaufman County.
What is Bowie Street & York Street Emergency Water Repairs [CIP 252]?
Bowie Street & York Street Emergency Water Repairs [CIP 252] is a new construction project at Bowie Street - Lovers to Pinson; York Street in Forney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing approximately 1,400 SY new 5' wide sidewalk and curb ramps along Bowie Street and York Street where there are no sidewalks currently.
Is Bowie Street & York Street Emergency Water Repairs [CIP 252] open in Forney?
Construction on Bowie Street & York Street Emergency Water Repairs [CIP 252] is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is Bowie Street & York Street Emergency Water Repairs [CIP 252] located?
Bowie Street & York Street Emergency Water Repairs [CIP 252] is located at Bowie Street - Lovers to Pinson; York Street, Forney, TX, 75126, in Kaufman County.
Who is the owner or developer of Bowie Street & York Street Emergency Water Repairs [CIP 252]?
City of Forney is the property owner/developer of record for Bowie Street & York Street Emergency Water Repairs [CIP 252], per its TDLR project registration.
Who is the architect or design firm for Bowie Street & York Street Emergency Water Repairs [CIP 252]?
Freeman-Millican, Inc. is the design firm of record for Bowie Street & York Street Emergency Water Repairs [CIP 252], according to its TDLR filing.
How much does Bowie Street & York Street Emergency Water Repairs [CIP 252] cost and how big is it?
Bowie Street & York Street Emergency Water Repairs [CIP 252] has an estimated construction value of $3.8M and approximately 1,400 square feet (about $2.68K/sqft), based on its TDLR filing.
Scope of Work
Installing approximately 1,400 SY new 5' wide sidewalk and curb ramps along Bowie Street and York Street where there are no sidewalks currently.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Bowie Street - Lovers to Pinson; York Street, Forney, TX, 75126
Related Projects
Same Owner
$40.1M totalWatch all construction in 75126 (Forney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Forney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.