Project intelligenceTDLR TABS2024016282New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Port of Galveston Cruise Terminal 16

1401 Harborside Dr, Galveston, TX, 77550

Construction complete · Sep 2026Project Closed

Port of Galveston Cruise Terminal 16 is a new construction project at 1401 Harborside Dr, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $30.0M across about 687,000 sq ft.

Estimated project value
$30.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
687,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$44/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 16, 2024877 days across supplied datesSep 10, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    15 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    478 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    384 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Port of Galveston Cruise Terminal 16

The Terminal 16 Parking Garage at 1401 Harborside Dr in Galveston is a completed 7-story structure with 687,000 square feet of space. This new construction project, filed under the name Port of Galveston Cruise Terminal 16, was designed to support cruise operations with dedicated levels for bus and shuttle drop-off, personal vehicles, taxis, and ride-share services. The facility includes restrooms, mechanical and electrical systems, elevators, and stairs to ensure accessibility across all floors.

Port of Galveston served as the owner of record for this $30,000,000 development. Bermello Ajamil & Partners - A Woolpert Company was the design firm responsible for the project’s planning. Construction began in May 2024 following a TDLR registration in April 2024. The scheduled build window lasted 478 days, which is longer than the 214-day median for similar new construction projects in Galveston County. The estimated cost of $44 per square foot is below the county median of $116 per square foot for comparable filings.

The site is located within a FEMA Special Flood Hazard Area, specifically zone AE. This classification is relevant for understanding the site’s environmental context in Galveston County. The project involved public funds and public land, reflecting the Port of Galveston’s role in managing local infrastructure. Other TDLR-registered projects by the same owner include the Terminal 25 Pedestrian Bridge and Wharf Road, totaling over $100 million in additional construction value.

Final inspection passed in August 2025, marking the completion of the physical construction phase. TDLR closed the project file in September 2026, which marks the end of the accessibility review process for this construction. This closure confirms that the project met all necessary regulatory requirements for accessibility in Texas. The status of the project is now officially closed in the state’s records.

Third-party sources, including a Facebook post by Port of Galveston Cruise Parking, have mentioned that parking at the Terminal 16 garage is available for reservation for Royal Caribbean cruises. The Port of Galveston website also lists the garage as an option for cruise parking. These references indicate that the facility is integrated into the local cruise logistics network, supporting the movement of passengers and vehicles in Galveston.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77550 (Galveston)

One email per change. Unsubscribe in one click. Privacy.

Port of Galveston Cruise Terminal 16 is a New Construction project located at 1401 Harborside Dr, Galveston, TX 77550 in Galveston, Texas. The project has an estimated value of $30.0M covering 687,000 sq ft. Port of Galveston is the property owner and Bermello Ajamil & Partners - A Woolpert Company is the design firm of record. The project was registered with TDLR on April 16, 2024.

Frequently Asked Questions

Is the Terminal 16 Parking Garage open for use?

The TDLR record shows the project is closed and inspection passed in August 2025. A Facebook post by Port of Galveston Cruise Parking stated that parking at the garage is available for reservation for Royal Caribbean cruises.

Who owned and designed the Terminal 16 Parking Garage?

The owner of record was the Port of Galveston. The design firm of record was Bermello Ajamil & Partners - A Woolpert Company.

What is the size and cost of the parking garage?

The garage is 687,000 square feet with an estimated cost of $30,000,000. This equates to $44 per square foot, which is below the Galveston County median for similar projects.

When did the Terminal 16 Parking Garage construction finish?

Construction started in May 2024. Final inspection passed in August 2025. TDLR closed the project file in September 2026.

Is the Terminal 16 Parking Garage in a flood zone?

Yes, the site is located inside a FEMA Special Flood Hazard Area, specifically zone AE, according to the National Flood Hazard Layer.

What is Port of Galveston Cruise Terminal 16?

Port of Galveston Cruise Terminal 16 is a new construction project at 1401 Harborside Dr in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a 7-story parking garage with support spaces, Parking 2- 7. Ground level for of bus and shuttle drop-off and pick-up, personal vehicle, taxi and ride-share transportation. Include restrooms, MEP, elevators and stairs

Is Port of Galveston Cruise Terminal 16 open in Galveston?

Construction on Port of Galveston Cruise Terminal 16 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Port of Galveston Cruise Terminal 16 located?

Port of Galveston Cruise Terminal 16 is located at 1401 Harborside Dr, Galveston, TX, 77550, in Galveston County.

Who is the owner or developer of Port of Galveston Cruise Terminal 16?

Port of Galveston is the property owner/developer of record for Port of Galveston Cruise Terminal 16, per its TDLR project registration.

Who is the architect or design firm for Port of Galveston Cruise Terminal 16?

Bermello Ajamil & Partners - A Woolpert Company is the design firm of record for Port of Galveston Cruise Terminal 16, according to its TDLR filing.

How much does Port of Galveston Cruise Terminal 16 cost and how big is it?

Port of Galveston Cruise Terminal 16 has an estimated construction value of $30.0M and approximately 687,000 square feet (about $44/sqft), based on its TDLR filing.

Scope of Work

New construction of a 7-story parking garage with support spaces, Parking 2- 7. Ground level for of bus and shuttle drop-off and pick-up, personal vehicle, taxi and ride-share transportation. Include restrooms, MEP, elevators and stairs

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1401 Harborside Dr, Galveston, TX, 77550

Location by street address

Watch all construction in 77550 (Galveston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Galveston?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.