Warehouse Facility
๐Project Metrics
TDLR #TABS2024016410Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
New construction of a 15,634 sq.ft. pre-fabricated metal warehouse
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.8M total๐๏ธSame Design Firm
$4.4M total๐Related City Permits
Building permits found at or near this location
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 3 Bedrooms 2.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8000 PONCHO PASS 2025-070709 (INCLUDES 22 ADDRESSES.)
Express- Removal of rotting siding. Installation of new sheathing and siding in its place. Service disconnect/ reconnect to get behind electrical panel.
Install Sprinkler System
Install one new 120V electrical receptacle in a recessed media box for a hallway wall-mounted TV on an existing circuit. Work includes: - Running NM-B cable from existing junction box to new outlet location. - Installing a standard duplex receptacle in a single-gang box attached to the media box. Add one additional single-gang duplex receptacle connected to the same existing junction box and circuit as the media box receptacle. GFCI protection to bathroom circuit by installing new receptacle upstream of existing devices. Existing receptacle will remain on load side of GFCI - Ensuring compliance with 2023 NEC and Austin local amendments. All work will be performed by homeowner as registered contractor.
Express- Removal of rotting siding. Installation of new sheathing and siding in its place. Service disconnect/ reconnect to get behind electrical panel.