Project intelligenceTDLR TABS2024016437Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Workforce Based High School Renovation in Fort Worth, TX

4001 Littleplage Street, Fort Worth, TX, 76107

Construction complete · Jun 2026Inspection Complete

Workforce Based High School Renovation is a renovation/alteration project at 4001 Littleplage Street, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $12.1M across about 54,293 sq ft.

Estimated project value
$12.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
54,293 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$222/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 17, 2024793 days across supplied datesJun 19, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    117 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    347 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    329 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Workforce Based High School Renovation

The Workforce Based High School Renovation at 4001 Littleplage Street in Fort Worth is complete. This project involves the interior and exterior renovation of an existing 54,293 sq ft campus. The final TDLR accessibility inspection passed in June 2026, confirming that construction is finished and the building meets state accessibility standards.

Project Scope and Design

Fort Worth Independent School District serves as the owner of record for this $12,059,890 renovation. Kline Hardin Architects was the design firm of record. The scope of work included new exterior windows and doors, a relocated front entry with a secure vestibule, and new interior finishes. These improvements were part of a broader renovation and alteration effort on the existing campus.

The project was registered with TDLR in April 2024, the same month plan review was completed. Construction began in August 2024. The scheduled completion date on the filing was July 2025. The work was completed ahead of the final inspection milestone, which occurred in June 2026. The project status is now listed as Inspection Complete.

Context and Comparisons

This renovation is significantly larger and more expensive than typical projects in the region. With an estimated cost of $12,059,890, it is above the county median for renovation and alteration filings in Tarrant County. The project size of 54,293 sq ft is also well above the median size for similar filings. The cost per square foot is $222, which is above the county median of $79 per square foot.

The scheduled build window was 347 days, which is longer than the county median of 92 days. This reflects the complexity of renovating an existing school facility while maintaining safety and accessibility standards. The project is one of several large-scale initiatives by Fort Worth Independent School District, which has other registered projects totaling over $170 million in Tarrant County.

This approval was part of a unanimous vote on the consent agenda. The project also appears in bid records from projects.constructconnect.com, where it was listed alongside other Fort Worth renovation projects with bid dates in April 2024.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76107 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Workforce Based High School Renovation is a Renovation/Alteration project located at 4001 Littleplage Street, Fort Worth, TX 76107 in Fort Worth, Texas. The project has an estimated value of $12.1M covering 54,293 sq ft. Fort Worth Independent School District is the property owner and Kline Hardin Architects is the design firm of record. The project was registered with TDLR on April 17, 2024.

Frequently Asked Questions

Is the Workforce Based High School renovation complete?

Yes, the project passed its final TDLR accessibility inspection in June 2026. The TDLR status is listed as Inspection Complete, indicating that construction is finished and the building meets state accessibility requirements.

Who is the owner of the Workforce Based High School project?

The owner of record is Fort Worth Independent School District. The design firm of record is Kline Hardin Architects. The project is located at 4001 Littleplage Street in Fort Worth, Texas.

What is the estimated cost of the renovation?

The estimated cost of the Workforce Based High School Renovation is $12,059,890. This is above the county median for renovation and alteration projects in Tarrant County, reflecting the scale and complexity of the work.

What changes were made to the building?

The scope of work included new exterior windows and doors, a relocated front entry with a secure vestibule, and new interior finishes. These improvements were part of a comprehensive renovation of the existing 54,293 sq ft campus.

When did construction start and finish?

Construction began in August 2024. The scheduled completion date on the filing was July 2025. The final TDLR accessibility inspection passed in June 2026, confirming that the project is complete.

What is Workforce Based High School Renovation?

Workforce Based High School Renovation is a renovation/alteration project at 4001 Littleplage Street in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of work on the existing 54,293 sq ft campus includes interior and exterior renovation improvements. This includes new exterior windows and doors, a relocated front entry with a secure vestibule, and new interior finishes.

Is Workforce Based High School Renovation open in Fort Worth?

Construction on Workforce Based High School Renovation is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Workforce Based High School Renovation located?

Workforce Based High School Renovation is located at 4001 Littleplage Street, Fort Worth, TX, 76107, in Tarrant County.

Who is the owner or developer of Workforce Based High School Renovation?

Fort Worth Independent School District is the property owner/developer of record for Workforce Based High School Renovation, per its TDLR project registration.

Who is the architect or design firm for Workforce Based High School Renovation?

Kline Hardin Architects is the design firm of record for Workforce Based High School Renovation, according to its TDLR filing.

How much does Workforce Based High School Renovation cost and how big is it?

Workforce Based High School Renovation has an estimated construction value of $12.1M and approximately 54,293 square feet (about $222/sqft), based on its TDLR filing.

Scope of Work

The scope of work on the existing 54,293 sq ft campus includes interior and exterior renovation improvements. This includes new exterior windows and doors, a relocated front entry with a secure vestibule, and new interior finishes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4001 Littleplage Street, Fort Worth, TX, 76107

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76107 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.