Project intelligenceTDLR TABS2024016437Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Workforce Based High School Renovation

4001 Littleplage Street, Fort Worth, TX, 76107

Construction complete · Jun 2026Inspection Complete

Workforce Based High School Renovation is a renovation/alteration project at 4001 Littleplage Street, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $12.1M across about 54,293 sq ft.

Estimated project value
$12.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
54,293 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$222/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 17, 2024793 days across supplied datesJun 19, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    117 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    347 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    329 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76107 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Workforce Based High School Renovation is a Renovation/Alteration project located at 4001 Littleplage Street, Fort Worth, TX 76107 in Fort Worth, Texas. The project has an estimated value of $12.1M covering 54,293 sq ft. Fort Worth Independent School District is the property owner and Kline Hardin Architects is the design firm of record. The project was registered with TDLR on April 17, 2024.

Frequently Asked Questions

What is Workforce Based High School Renovation?

Workforce Based High School Renovation is a renovation/alteration project at 4001 Littleplage Street in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of work on the existing 54,293 sq ft campus includes interior and exterior renovation improvements. This includes new exterior windows and doors, a relocated front entry with a secure vestibule, and new interior finishes.

Is Workforce Based High School Renovation open in Fort Worth?

Construction on Workforce Based High School Renovation is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Workforce Based High School Renovation located?

Workforce Based High School Renovation is located at 4001 Littleplage Street, Fort Worth, TX, 76107, in Tarrant County.

Who is the owner or developer of Workforce Based High School Renovation?

Fort Worth Independent School District is the property owner/developer of record for Workforce Based High School Renovation, per its TDLR project registration.

Who is the architect or design firm for Workforce Based High School Renovation?

Kline Hardin Architects is the design firm of record for Workforce Based High School Renovation, according to its TDLR filing.

How much does Workforce Based High School Renovation cost and how big is it?

Workforce Based High School Renovation has an estimated construction value of $12.1M and approximately 54,293 square feet (about $222/sqft), based on its TDLR filing.

Scope of Work

The scope of work on the existing 54,293 sq ft campus includes interior and exterior renovation improvements. This includes new exterior windows and doors, a relocated front entry with a secure vestibule, and new interior finishes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76107 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists