Flex HQ - Phase 1 is a renovation/alteration project at 12515 Research Blvd Building 8 Suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $5.0M across about 31,817 sq ft.
Project has been completed and closed
Flex HQ - Phase 1 is a Renovation/Alteration project located at 12515 Research Blvd Building 8 Suite 300, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $5.0M covering 31,817 sq ft. Carlos Sotomayor is the property owner and Studio 8 Architects is the design firm of record. The project was registered with TDLR on April 18, 2024.
Flex HQ - Phase 1 is a renovation/alteration project at 12515 Research Blvd Building 8 Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Full floor interior renovation
Construction on Flex HQ - Phase 1 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Flex HQ - Phase 1 is located at 12515 Research Blvd Building 8 Suite 300, Austin, TX, 78759, in Travis County.
Carlos Sotomayor is the property owner/developer of record for Flex HQ - Phase 1, per its TDLR project registration.
Studio 8 Architects is the design firm of record for Flex HQ - Phase 1, according to its TDLR filing.
Flex HQ - Phase 1 has an estimated construction value of $5.0M and approximately 31,817 square feet (about $157/sqft), based on its TDLR filing.
Full floor interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 18, 2024
Review Complete
Inspection Complete
Closed
Aug 31, 2024
Building permits found at or near this location
Run conduit approximately 40ft on left side of house from main panel to garage for nema 14-50r installed in the garage for car charger.
Express- Foundation Repair on a slab foundation. Install 18 total press piling pier locations along the perimeter. There will be 2 breakthrough and patched locations. We will improve level to the extent.
Condominium Residence Install new screen enclosure under existing covered back patio
Replacement of an existing water heater
Change out HVAC like for like and add 1 new electrical circuit.