Project intelligenceTDLR TABS2024016679New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Anahuac Operations Center

910. S Sterling, Anahuac, TX, 77514

Construction complete · Apr 2025Project Closed

Anahuac Operations Center is a new construction project at 910. S Sterling, Anahuac, in Chambers County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $5.7M across about 18,834 sq ft.

Estimated project value
$5.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
18,834 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$303/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 2024348 days across supplied datesApr 5, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    105 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    243 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Anahuac Operations Center

The Anahuac Operations Center is a new 18,834 sq ft pre-engineered metal building located at 910. S Sterling in Anahuac, Texas. This single-story facility serves as the district transportation, bus, and maintenance center for the Anahuac Independent School District. The project was registered with TDLR in April 2024, with construction beginning in August 2024.

The estimated cost for this new construction was $5,700,000, which calculates to $303 per square foot. This figure is above the county median of $106 per square foot for similar filings in Chambers County. The scheduled build window was 243 days, a duration close to the county median of 304 days for new construction projects.

Project Status and Completion

TDLR closed the project file in April 2025. This action marks the end of the accessibility review process for this construction. The filing indicated a completion date of April 2025, and the TDLR status is now listed as Project Closed. The registered accessibility specialist for this work was Sharareh Abdi.

Cre8 Architects is the design firm of record for the Anahuac Operations Center. The firm has worked on six other TDLR-registered projects, totaling $1,797,009, including schools in Sugar Land and Mont Belvieu. The Anahuac Independent School District is the owner of record, with four other closed TDLR projects in the area totaling $35,500,000.

Public funds supported this project, which is situated in Chambers County. The area profile for ZIP 77514 indicates a population of about 5,213 and a median household income of $73,500. The housing stock is predominantly owner-occupied, with a median owner-occupied home value of $200,300 according to U.S. Census estimates.

Third-party records provide additional context for the project's activities. Another source, quorum.sparqdata.com, referenced a board meeting held at the 910 South Ross Sterling location. These mentions align with the TDLR record of a completed facility in Anahuac.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77514 (Anahuac)

One email per change. Unsubscribe in one click. Privacy.

Anahuac Operations Center is a New Construction project located at 910. S Sterling, Anahuac, TX 77514 in Anahuac, Texas. The project has an estimated value of $5.7M covering 18,834 sq ft. Anahuac Independent School District is the property owner and cre8 Architects is the design firm of record. The project was registered with TDLR on April 22, 2024.

Frequently Asked Questions

Is the Anahuac Operations Center open?

The TDLR record shows the project file was closed in April 2025, indicating the construction and accessibility review are complete. Third-party sources mention board meetings and furnishing approvals at the location, suggesting it is in use, but the TDLR record only confirms construction status.

Who is the owner of the Anahuac Operations Center?

The Anahuac Independent School District is the owner and developer of record for this project. The district has four other TDLR-registered projects in the area, all of which are closed.

What is the estimated cost of the Anahuac Operations Center?

The estimated cost for the new construction was $5,700,000. This amount is above the county median for similar new construction filings in Chambers County.

Who designed the Anahuac Operations Center?

Cre8 Architects is the design firm of record. They have worked on six other TDLR-registered projects, including schools in Sugar Land and Mont Belvieu.

When did construction on the Anahuac Operations Center start?

Construction started in August 2024, according to the TDLR filing. The project was registered with TDLR in April 2024.

What is Anahuac Operations Center?

Anahuac Operations Center is a new construction project at 910. S Sterling in Anahuac, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 1 story pre-engineered metal building for use as the district transportation, bus & maintenance center

Is Anahuac Operations Center open in Anahuac?

Construction on Anahuac Operations Center is complete — TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.

Where is Anahuac Operations Center located?

Anahuac Operations Center is located at 910. S Sterling, Anahuac, TX, 77514, in Chambers County.

Who is the owner or developer of Anahuac Operations Center?

Anahuac Independent School District is the property owner/developer of record for Anahuac Operations Center, per its TDLR project registration.

Who is the architect or design firm for Anahuac Operations Center?

cre8 Architects is the design firm of record for Anahuac Operations Center, according to its TDLR filing.

How much does Anahuac Operations Center cost and how big is it?

Anahuac Operations Center has an estimated construction value of $5.7M and approximately 18,834 square feet (about $303/sqft), based on its TDLR filing.

Scope of Work

New 1 story pre-engineered metal building for use as the district transportation, bus & maintenance center

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

910. S Sterling, Anahuac, TX, 77514

Location by street address

Watch all construction in 77514 (Anahuac)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.