Project intelligenceTDLR TABS2024016731Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

UTSA Phase 3 Classrooms DC

501 W. Cesar E. Chavez Blvd., San Antonio, TX 7820, San Antonio, TX, 78249

Construction complete · Jun 2025Project Closed

UTSA Phase 3 Classrooms DC is a renovation/alteration project at 501 W. Cesar E. Chavez Blvd., San Antonio, TX 7820, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2025). The project has an estimated value of $119K across about 5,670 sq ft.

Estimated project value
$119K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,670 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 2024420 days across supplied datesJun 16, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    397 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78249 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

UTSA Phase 3 Classrooms DC is a Renovation/Alteration project located at 501 W. Cesar E. Chavez Blvd., San Antonio, TX 7820, San Antonio, TX 78249 in San Antonio, Texas. The project has an estimated value of $119K covering 5,670 sq ft. UTSA is the property owner and Chesney Morales Partners is the design firm of record. The project was registered with TDLR on April 22, 2024.

Frequently Asked Questions

What is UTSA Phase 3 Classrooms DC?

UTSA Phase 3 Classrooms DC is a renovation/alteration project at 501 W. Cesar E. Chavez Blvd., San Antonio, TX 7820 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4 classrooms- remove existing ceiling mounted projector and install Unistrut above ceiling for new ceiling mounted projector with existing infrastructure.

Is UTSA Phase 3 Classrooms DC open in San Antonio?

Construction on UTSA Phase 3 Classrooms DC is complete — TDLR records show the project passed its required accessibility inspection in Jun 2025. The building is finished and very likely open.

Where is UTSA Phase 3 Classrooms DC located?

UTSA Phase 3 Classrooms DC is located at 501 W. Cesar E. Chavez Blvd., San Antonio, TX 7820, San Antonio, TX, 78249, in Bexar County.

Who is the owner or developer of UTSA Phase 3 Classrooms DC?

UTSA is the property owner/developer of record for UTSA Phase 3 Classrooms DC, per its TDLR project registration.

Who is the architect or design firm for UTSA Phase 3 Classrooms DC?

Chesney Morales Partners is the design firm of record for UTSA Phase 3 Classrooms DC, according to its TDLR filing.

How much does UTSA Phase 3 Classrooms DC cost and how big is it?

UTSA Phase 3 Classrooms DC has an estimated construction value of $119K and approximately 5,670 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

4 classrooms- remove existing ceiling mounted projector and install Unistrut above ceiling for new ceiling mounted projector with existing infrastructure.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

501 W. Cesar E. Chavez Blvd., San Antonio, TX 7820, San Antonio, TX, 78249

Location by street address

Watch all construction in 78249 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.