24th Street Overpass and Pedestrian Improvements in Temple, TX
S 24th St, from Martin Luther King Jr Drive, to E, Temple, TX, 76501
24th Street Overpass and Pedestrian Improvements is a renovation/alteration project at S 24th St, from Martin Luther King Jr Drive, to E, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.2M across about 186,250 sq ft.
- Estimated project value
- $3.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 186,250 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $17/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
39 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
394 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76501 (Temple)
One email per change. Unsubscribe in one click. Privacy.
24th Street Overpass and Pedestrian Improvements is a Renovation/Alteration project located at S 24th St, from Martin Luther King Jr Drive, to E, Temple, TX 76501 in Temple, Texas. The project has an estimated value of $3.2M covering 186,250 sq ft. City of Temple is the property owner and KPA Engineers is the design firm of record. The project was registered with TDLR on April 23, 2024.
Frequently Asked Questions
What is 24th Street Overpass and Pedestrian Improvements?
24th Street Overpass and Pedestrian Improvements is a renovation/alteration project at S 24th St, from Martin Luther King Jr Drive, to E in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of the modification of the overpass that's currently 4 lanes, to a 2-lane overpass with a pedestrian sidewalk located at the western side of the road. In addition the abutments of the overpass will be repaired.
Is 24th Street Overpass and Pedestrian Improvements open in Temple?
24th Street Overpass and Pedestrian Improvements was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is 24th Street Overpass and Pedestrian Improvements located?
24th Street Overpass and Pedestrian Improvements is located at S 24th St, from Martin Luther King Jr Drive, to E, Temple, TX, 76501, in Bell County.
Who is the owner or developer of 24th Street Overpass and Pedestrian Improvements?
City of Temple is the property owner/developer of record for 24th Street Overpass and Pedestrian Improvements, per its TDLR project registration.
Who is the architect or design firm for 24th Street Overpass and Pedestrian Improvements?
KPA Engineers is the design firm of record for 24th Street Overpass and Pedestrian Improvements, according to its TDLR filing.
How much does 24th Street Overpass and Pedestrian Improvements cost and how big is it?
24th Street Overpass and Pedestrian Improvements has an estimated construction value of $3.2M and approximately 186,250 square feet (about $17/sqft), based on its TDLR filing.
Scope of Work
The project consists of the modification of the overpass that's currently 4 lanes, to a 2-lane overpass with a pedestrian sidewalk located at the western side of the road. In addition the abutments of the overpass will be repaired.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
S 24th St, from Martin Luther King Jr Drive, to E, Temple, TX, 76501
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$254.4M totalWatch all construction in 76501 (Temple)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Temple?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.