PANERA #6386
PANERA #6386 is a renovation/alteration project at 5200 SOUTH FM 1626, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $1.2M across about 3,200 sq ft.
๐Project Metrics
TDLR #TABS2024018344Project Closed
Project has been completed and closed
PANERA #6386 is a Renovation/Alteration project located at 5200 SOUTH FM 1626, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.2M covering 3,200 sq ft. CSW KC II L9,LP is the property owner and ARCVISION is the design firm of record. The project was registered with TDLR on May 13, 2024.
โFrequently Asked Questions
What is PANERA #6386?
PANERA #6386 is a renovation/alteration project at 5200 SOUTH FM 1626 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TENANT INTERIOR
Is PANERA #6386 open in Kyle?
Construction on PANERA #6386 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is PANERA #6386 located?
PANERA #6386 is located at 5200 SOUTH FM 1626, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of PANERA #6386?
CSW KC II L9,LP is the property owner/developer of record for PANERA #6386, per its TDLR project registration.
Who is the architect or design firm for PANERA #6386?
ARCVISION is the design firm of record for PANERA #6386, according to its TDLR filing.
How much does PANERA #6386 cost and how big is it?
PANERA #6386 has an estimated construction value of $1.2M and approximately 3,200 square feet (about $375/sqft), based on its TDLR filing.
๐Scope of Work
TENANT INTERIOR
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 13, 2024
Review Complete
Inspection Complete
Closed
Dec 15, 2024
๐Related Projects
๐๏ธSame Design Firm
$145.1M total๐Related City Permits
Building permits found at or near this location
Addition/remodel- Addition to SFR adding one bedroom and bathroom to the ground floor bonus room to level 2 over the existing garage. Expanding 2 existing upstairs bedrooms.
Repair break under home on sewer line access by tunnel
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT
Construct new sidewalk of 47 LF 2025 027701 000 00 SSI SP-2019-0557C
repipe gas line to furnace from plugged tee to furnace run dedicated line from meter to tankless and resolve venting issue